Notice of Meeting Te Pānui o te Hui:

An ordinary meeting of the Waimāero Fendalton-Waimairi-Harewood Community Board will be held on:

 

Date:                                    Monday 8 December 2025

Time:                                   4.30 pm

Venue:                                 Boardroom, Fendalton Service Centre,
Corner Jeffreys and Clyde Roads, Fendalton

 

 

Membership Ngā Mema

Chairperson

Deputy Chairperson

Members

Jason Middlemiss

Nicola McCormick

David Cartwright

James Gough

Aaron Keown

Lucy Keown

Sam MacDonald

Ben Spittle

Bridget Williams

 

 

3 December 2025

 

 

Principal Advisor

Maryanne Lomax

Manager Community Governance

Tel: 941 6730

maryanne.lomax@ccc.govt.nz

Meeting Advisor

Aidan Kimberley

Community Board Advisor

Tel: 941 6566

aidan.kimberley@ccc.govt.nz

Website: www.ccc.govt.nz

 

 

Note:  The reports contained within this agenda are for consideration and should not be construed as Council policy unless and until adopted.  If you require further information relating to any reports, please contact the person named on the report.
To watch the meeting live, or a recording after the meeting date, go to:
https://www.youtube.com/@fendaltonwaimairiharewoodc6878/streams
To view copies of Agendas and Minutes, go to:
https://www.ccc.govt.nz/the-council/meetings-agendas-and-minutes/

 


A poster of a company's plan

AI-generated content may be incorrect.

 


Part A           Matters Requiring a Council Decision

Part B           Reports for Information

Part C           Decisions Under Delegation

 

 

TABLE OF CONTENTS NGĀ IHIRANGI

 

Karakia Tīmatanga................................................................................................... 5 

C          1.        Apologies Ngā Whakapāha.......................................................................... 5

B         2.        Declarations of Interest Ngā Whakapuaki Aronga........................................... 5

C          3.        Confirmation of Previous Minutes Te Whakaāe o te hui o mua.......................... 5

B         4.        Public Forum Te Huinga Whānui.................................................................. 5

B         5.        Deputations by Appointment Ngā Huinga Whakaritenga................................. 5

B         6.        Presentation of Petitions Ngā Pākikitanga.................................................... 5

Staff Reports

C          7.        Proposed Road Names - 130 Styx Mill Road and 244 Gardiners Road................ 11

C          8.        Proposed Road Name - 132 Claridges Road, Styx.......................................... 19

C          9.        Tree Removal in Bishopdale Mall................................................................ 23

C          10.      Community Parks Rolling Renewal Programme........................................... 35

CA       11.      Dedication of Local Purpose Reserve (Road) 3 R Tulett Park Drive Casebrook... 49

C          12.      Athol Terrace - Proposed No Stopping Restrictions....................................... 59

C          13.      Clyde Road Parking Restrictions................................................................ 69

C          14.      Proposed P120 Parking Restrictions - Staveley Street................................... 75

C          15.      Waimāero Fendalton-Waimairi-Harewood - Better-Off Fund Applications for Consideration - Anglican Diocese of Christchurch - Parish of Merivale St Albans; Riccarton Sports Hub Trust....................................................................... 89

C          16.      Fendalton-Waimairi-Harewood 2025-2026 Discretionary Response Fund Applications - Burnside Squash Rackets Club Incorporated, St Margaret's Church, Yaldhurst School, Anglican Diocese of Christchurch Parish of Burnside Harewood, Kiribati Federation Aotearoa Incorporated.................................................. 99

C          17.      Governance Matters............................................................................... 107

C          18.      Waimāero Fendalton-Waimairi-Harewood Community Board Area Report - December 2025...................................................................................... 113  

 

B         19.      Elected Members’ Information Exchange Te Whakawhiti Whakaaro o Te Kāhui Amorangi............................................................................................................ 125  

Karakia Whakamutunga

 

Actions Register Ngā Mahinga Tuwhera

 

 


 

Karakia Tīmatanga

Whakataka te hau ki te uru

Whakataka te hau ki te tonga

Kia mākinakina ki uta

Kia mātaratara ki tai

E hī ake ana te atakura

He tio, he huka, he hau hū

Tīhei Mauri Ora

Cease the winds from the west
Cease the winds from the south
Let the breeze blow over the land
Let the breeze blow over the ocean
Let the red-tipped dawn come with a sharpened air.
A touch of frost, a promise of a glorious day.

 

1.   Apologies Ngā Whakapāha  

Apologies will be recorded at the meeting.

2.   Declarations of Interest Ngā Whakapuaki Aronga

Members are reminded of the need to be vigilant and to stand aside from decision-making when a conflict arises between their role as an elected representative and any private or other external interest they might have.

3.   Confirmation of Previous Minutes Te Whakaāe o te hui o mua

That the minutes of the Waimāero Fendalton-Waimairi-Harewood Community Board meeting held on Monday, 10 November 2025  be confirmed (refer page 6).

4.   Public Forum Te Huinga Whānui

A period of up to 30 minutes will be available for people to speak for up to five minutes on any issue that is not the subject of a separate hearing process.

 

4.1

Northwood Residents’ Association

Clive Smith will speak on behalf of the Northwood Residents’ Association regarding a planned roading layout for Northwood Boulevard.

 

 

5.   Deputations by Appointment Ngā Huinga Whakaritenga

Deputations may be heard on a matter or matters covered by a report on this agenda and approved by the Chairperson.

 

Deputations will be recorded in the meeting minutes.

6.   Presentation of Petitions Ngā Pākikitanga

There were no petitions received at the time the agenda was prepared.   

 

To present to the Community Board, refer to the Participating in decision-making webpage or contact the meeting advisor listed on the front of this agenda.


A black text on a white background

AI-generated content may be incorrect.

 

 

Waimāero

Fendalton-Waimairi-Harewood Community Board

Inaugural meeting Minutes

 

 

Date:                                    Monday 10 November 2025

Time:                                   5.05 pm

Venue:                                 Boardroom, Fendalton Service Centre,
Corner Jeffreys and Clyde Roads, Fendalton

 

 

Present

Members

David Cartwright

James Gough

Aaron Keown

Lucy Keown

Sam MacDonald

Nicola McCormick

Jason Middlemiss

Ben Spittle

Bridget Williams

 

 

 

 

 

 

Principal Advisor

Maryanne Lomax

Manager Community Governance

Tel: 941 6730

maryanne.lomax@ccc.govt.nz

Meeting Advisor

Aidan Kimberley

Community Board Advisor

Tel: 941 6566

aidan.kimberley@ccc.govt.nz

Website: www.ccc.govt.nz

 

 

To watch meetings, live, or previous recordings, go to:
https://www.youtube.com/@fendaltonwaimairiharewoodc6878/streams
To view copies of Agendas and Minutes, go to:
https://www.ccc.govt.nz/the-council/meetings-agendas-and-minutes/

 


 

Part A           Matters Requiring a Council Decision

Part B           Reports for Information

Part C           Decisions Under Delegation

 

 

 

The agenda was dealt with in the following order.

 

Karakia Tīmatanga:

1.   Welcome and Introduction, Te Mānawa me te Whakataki

         Mary Richardson, Chief Executive, assumed the Chair and declared the meeting open.

2.   Apologies Ngā Whakapāha

Part C

Community Board Decision

There were no apologies.

 

3.   Declarations by Members Te Kī Taurangi a te Mema Poari

 

Community Board Comment

The Members present each made their oral declarations, then signed their written declarations in the presence of the Chief Executive in accordance with Clause 14, Schedule 7 of the Local Government Act 2002.

 

4.   Election of a Chairperson

 

Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Election of a Chairperson Report.

2.         Adopts, by resolution, whether it will use System A or System B to elect a Chairperson and Deputy Chairperson.

3.         Proceeds to elect a Chairperson and Deputy Chairperson.

 

Community Board Resolved FWHB/2025/00057

Part C

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Election of a Chairperson Report.

2.         Adopts System B to elect a Chairperson and Deputy Chairperson.

James Gough/Sam MacDonald                                                                                                                           Carried

 

Community Board Resolved FWHB/2025/00058

3.         Elects Jason Middlemiss as Chairperson of the Waimāero Fendalton-Waimairi-Harewood Community Board for the 2025-28 electoral term.

James Gough/Sam MacDonald                                                                                                                           Carried

 

 

5.   Declaration by Chairperson Te Kī Taurangi a te Tiamana o te Poari Hāpori

 

Community Board Comment

Jason Middlemiss made his oral declaration as Chairperson, then signed his written declaration in the presence of the Chief Executive in accordance with Clause 14, Schedule 7 of the Local Government Act 2002.

Jason Middlemiss assumed the Chair.

6.   Election of Deputy Chairperson

 

Community Board Resolved FWHB/2025/00059

Part C

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Elects Nicola McCormick as Deputy Chairperson of the Waimāero Fendalton-Waimairi-Harewood Community Board for the 2025-28 electoral term.

Sam MacDonald/Ben Spittle                                                                                                                                Carried

 

 

7.   Explanation of Statutory Requirements

 

Community Board Resolved FWHB/2025/00060

Part C

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Explanation of Statutory Requirements report.

David Cartwright/Aaron Keown                                                                                                                          Carried

 


 

8.   Date of First Ordinary Meeting

 

Community Board Resolved FWHB/2025/00061

Part C

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Date of First Ordinary Meeting Report.

2.         Notes that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Pursuant to Schedule 7, clause 21(5)(d) of the Local Government Act 2002, resolves that the first ordinary meeting of the Waimāero Fendalton-Waimairi-Harewood Community Board be held on Monday 8 December 2025 at 4.30 pm. in the Boardroom, Fendalton Service Centre, Corner Jeffreys and Clyde Roads, Fendalton, Christchurch.

Nicola McCormick/Lucy Keown                                                                                                                           Carried

 

 

 

Karakia Whakamutunga 

 

Meeting concluded at 5.25 pm.

 

CONFIRMED THIS 8TH DAY OF DECEMBER 2025

 

Jason Middlemiss

Chairperson

 


7.     Proposed Road Names - 130 Styx Mill Road and 244 Gardiners Road

Reference Te Tohutoro:

25/2064834

Responsible Officer(s) Te Pou Matua:

Sean Ward, Team Leader Planning

Accountable ELT Member Pouwhakarae:

John Higgins, General Manager Strategy, Planning & Regulatory Services

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waimāero Fendalton-Waimairi-Harewood Community Board to approve the proposed lane names at 130 Styx Mill Road, Styx, and the proposed road/lane names at 244 Gardiners Road, Styx.

1.2       The report is staff-generated resulting from a naming request received from the developer.

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Proposed Road Names - 130 Styx Mill Road and 244 Gardiners Road Report.

2.         Notes that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves the following new lane names for 130 Styx Mill Road (RMA/2022/487)

a.         Lane 1 - Millhouse Lane

b.         Lane 2 - Flaxmere Lane

4.         Approves the following new road/lane names for 244 Gardiners Road (RMA/2023/2182)

a.         Road 1 - Donnithorne Road

b.         Lane 1 - Cinnamon Lane

3.   Detail Te Whakamahuki

Introduction Te Whakatkinga

3.1       A road naming request has been submitted by the agent on behalf of each developer. A preferred name and alternative names have been put forward for the roads/lanes.

3.2       The recommended road names have been checked against existing road names in Christchurch and bordering districts, for duplication, alternative spelling, or other similarities in spelling or pronunciation to avoid the potential for confusion. The proposed names are considered sufficiently different to existing road names.

3.3       The recommended road names have been checked against the Council’s Naming Policy dated 15 November 2023 and is considered to be consistent with this policy. The specific criteria for assessing a name from clause 2 is set out below.

3.3.1   A traditional or Māori name which is acceptable to the Rūnanga or Iwi; this may be a name reflecting the physical characteristics of an area, an activity or event associated with the area or of a notable ancestor. 

3.3.2   A feature of historical, social, cultural, environmental or physical importance in the area (e.g., Carlton Mill Road or Carlton Mill Reserve*).

3.3.3   The name of a notable family, person or event associated with the locality or with the wider Christchurch area. 

3.3.4   A name in recognition of a person’s service. This can be for community service, conservation, sport, the arts, science and research or other sphere of activity.

3.3.5   Consistency with a common or established theme for naming in a subdivision or locality.

3.3.6   A name that reflects the diverse cultures and communities of the locality or of Christchurch generally.

3.3.7   The name of an event or activity strongly associated with the immediate location including an informal name for the area that is (or was historically) in common usage. 

3.3.8   A name associated with a person, event or activity of significance to Christchurch including names associated with people, events, or places of national and international significance. 

3.4       The criteria for names that are not suitable for approval from clause 6 are set out below.

3.4.1   Names of people, flora, fauna or geographical features not associated with the area, e.g., names of native trees which are not present in the area or views that cannot be identified, except where the name continues a current naming theme in the locality. 

3.4.2   Currently trading commercial organisations except for sponsorship names for facilities and leased parks.

3.4.3   Anagrams, amalgamations or derivatives of people's names.

3.4.4   Names of living persons.

3.4.5   Names related to the developer of a subdivision.

3.4.6   Name of a person, club or organisation associated with a privately owned building on Council land, where the club or organisation does not hold the ground lease for the building.

3.4.7   Names for roads which may cause confusion because they are associated with another geographical location or feature e.g., Parklands Drive which is not located in the Parklands suburb.

3.5       The recommended road names have also been checked against the Australia and New Zealand Standard AS/NZA 4819:2011 Rural and Urban Addressing. The names are considered to be consistent with the Standard.

3.6       Under the Roads and Right-of-Way Naming Policy, the name considered must be requested by the developer. There is no ability to consider alternative names without first checking whether there are any duplications or similarities with other road and right-of-way names.

3.7       Consultation has been undertaken with Land Information New Zealand who have raised no concerns with the proposed names.

3.8       Consultation under the policy with rūnanga is not required because the roads to be named are not collector roads and/or site(s) of significance under the District Plan (clause 3 of the Naming Policy).

3.9       No addresses of neighbouring properties are affected by the proposed road naming (clause 12.2 of the Naming Policy).

3.10    The names requested have been accompanied by an explanation of the background of the names, which is summarised below.

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.11    The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.12    The level of significance was determined by the number of people affected and/or with an interest.

3.13    Due to the assessment of low significance, no further community engagement and consultation is required.

Proposed Names - 130 Styx Mill Road RMA/2022/487

3.14    The proposed roads are shown in Attachment A.

3.15    The proposed name and alternative names are themed for attributes associated with the area.

3.16    Lane 1 - Millhouse Lane

3.17    Millhouse refers to the frontage road Styx Mill Road and historical milling activities in the general area i.e. timber, flax etc.

3.18    Lane 2 - Flaxmere Lane

3.19    Flaxmere refers to the local flax around the adjacent lake and 'mere' being a shallow lake.

Alternative Names - 130 Styx Mill Road RMA/2022/487

3.20    Millstone Lane - Millstone refers to the frontage road Styx Mill Road and historical milling activities in the general area i.e. timber, flax etc.

3.21    Flaxmore Lane - Flaxmore refers to the local flax around the adjacent lake.

3.22    Flaxcroft Lane - Flaxcroft refers to the local flax around the adjacent lake and 'croft' being a small farmed area sometimes relating to an area of rented common land.

3.23    Silvermill Lane - Silvermill refers to the frontage road Styx Mill Road and historical milling activities in the general area i.e. timber, flax etc.

3.24    The proposed and alternative names are considered to be consistent with the policy.

3.25    Notwithstanding, the discretion lies with the Community Board to approve any of the above name options, including the alternative names.

Proposed Names - 244 Gardiners Road RMA/2023/2182

3.26    The proposed roads are shown in Attachment A.

3.27    The proposed name and alternative names are themed for local history and the local environment.

3.28    Road 1 - Donnithorne Road

3.29    The Donnithorne name has been a very prominent family name associated with the Styx River/Highsted area for many decades. John and Edith Donnithorne first settled in the Sawyers Arms Road, Casebrook area in 1955, where they remained for the next 58 years.  

Their two sons, Garry and Andrew, took up residences and farmed land holdings in the area commencing in the late 1960’s, including market garden farming on Crofton Road and Gardiners Road, and dog kennels on Hussey Road for an uninterrupted 50-year period.  

Garry’s specialty was pick your own peas, cauliflowers and lettuces, which continued to be grown on the 246 Gardiners Road property though until the early 1990’s when the small block farming model became unsustainable. 

Andrew was also active with farming in the area, preferring livestock and running up to 200 grazing cattle, sheep and feed bailage on the surrounding properties in the blocks between Gardiners Road and Cavendish Road bordering Tulett Park, up until they were developed into residential sections during the last 15 years. 

Both men became prominent businessmen in Christchurch, with Garry receiving a Queens Service Medal for Services to the Community in 2016, to go with his Papal Cross of Honour for distinguished services to the Catholic Church received in 2014.   

This tradition has carried on into the third and fourth generations with Garry’s son, Jason and his family currently residing in the old homestead on the property.

Andrew passed in 2020 and his widow Hellen continues to live and graze cattle mobs on her property opposite Jason on Gardiners Road.

3.30    Lane 1 - Cinnamon Lane

3.31    In the late 1980’s through to the mid 1990’s the local farm children in the area would congregate together with their ponies, starting up the top end of Gardiners Road by Poppies Preschool and picking up “like minded horse friends” as they headed to the meeting point on the corner of Gardiners Road and Claridges Road.

The consortium of ponies, some ridden, some walked, some saddled, some bareback, was quite an attraction as they meandered into the residential streets. Led by “Cinnamon,” an adopted old mare that was placid and calm, she the perfect example of love over performance and set the pace at a slow walk towards the Grampian Street dairy to buy lollies and ice creams.

Alternative Names - 244 Gardiners Road RMA/2023/2182

3.32    Terra Road/Lane - Terra represents the safe passage of land. In order to safely cross the Pūharakekenui/Styx River, sticks were laid out to mark safe passage on firm ground.

3.33    Waterwheel Road/Lane - During European settlement, the area was used for a number of purposes including sheep farming and milling. The river was used to drive waterwheels and provided an important source of power for sawmills and flaxmills. By the time the First World War came along, milling had ceased on the site.

3.34    Sawmill Road/Lane - During European settlement the area was used for a number of purposes including sheep farming and milling. The river provided an important source of power for sawmills. By the time the First World War came along, milling had ceased on the site.

3.35    Quail Road/Lane - The New Zealand quail was the only quail endemic to New Zealand and was extinct by around 1875. New Zealand now has three species of quail; california, brown and bobwhite, all introduced into New Zealand in the late 1800’s primarily for game hunting.

3.36    The proposed and alternative names are considered to be consistent with the policy, except for “Donnithorne Road”, as this is directly related to the developer (6.1.e) and some of the family members mentioned are still alive (6.1.d), however it is also in reference to a notable local family (2.1.c).

3.37    Notwithstanding the apparent inconsistency above, the discretion lies with the Community Board to approve any of the above name options, including the alternative names.


 

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

RMA/2022/487 - Proposed Road Names Plan - 130 Styx Mill Road

25/1698491

16

b

RMA/2023/2182 - Proposed Road Names Plan - 244 Gardiners Road

25/1697671

17

 

 

Signatories Ngā Kaiwaitohu

Authors

Leashelle Miller - Planner Level 2

Sean Ward - Team Leader Planning

Approved By

Mark Stevenson - Head of Planning & Consents

 

 


A black and white map of a neighborhood

AI-generated content may be incorrect.


A map of a neighborhood

AI-generated content may be incorrect.


8.     Proposed Road Name - 132 Claridges Road, Styx

Reference Te Tohutoro:

25/2370860

Responsible Officer(s) Te Pou Matua:

Sean Ward, Team Leader Planning

Accountable ELT Member Pouwhakarae:

John Higgins, General Manager Strategy, Planning & Regulatory Services

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waimāero Fendalton-Waimairi-Harewood Community Board to approve the proposed lane name at 132 Claridges Road, Styx.

1.2       The report is staff-generated resulting from a naming request received from the developer.

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Proposed Road Name - 132 Claridges Road, Styx Report.

2.         Notes that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves the following new lane name for 132 Claridges Road (RMA/2025/694)

a.         Lane 1 - Claridgewood Lane

3.   Detail Te Whakamahuki

Introduction Te Whakatkinga

3.1       A road naming request has been submitted by the agent on behalf of each developer. A preferred name and alternative names have been put forward for the lane.

3.2       The recommended road name has been checked against existing road names in Christchurch and bordering districts, for duplication, alternative spelling, or other similarities in spelling or pronunciation to avoid the potential for confusion. The proposed name is considered sufficiently different to existing road names.

3.3       The recommended road name and alternatives have been checked against the Council’s Naming Policy dated 15 November 2023 and two of the three are considered to be consistent with this policy. The specific criteria for assessing a name from clause 2 is set out below.

3.3.1   A traditional or Māori name which is acceptable to the Rūnanga or Iwi; this may be a name reflecting the physical characteristics of an area, an activity or event associated with the area or of a notable ancestor. 

3.3.2   A feature of historical, social, cultural, environmental or physical importance in the area (e.g., Carlton Mill Road or Carlton Mill Reserve*).

3.3.3   The name of a notable family, person or event associated with the locality or with the wider Christchurch area. 

3.3.4   A name in recognition of a person’s service. This can be for community service, conservation, sport, the arts, science and research or other sphere of activity.

3.3.5   Consistency with a common or established theme for naming in a subdivision or locality.

3.3.6   A name that reflects the diverse cultures and communities of the locality or of Christchurch generally.

3.3.7   The name of an event or activity strongly associated with the immediate location including an informal name for the area that is (or was historically) in common usage. 

3.3.8   A name associated with a person, event or activity of significance to Christchurch including names associated with people, events, or places of national and international significance. 

3.4       The criteria for names that are not suitable for approval from clause 6 are set out below.

3.4.1   Names of people, flora, fauna or geographical features not associated with the area, e.g., names of native trees which are not present in the area or views that cannot be identified, except where the name continues a current naming theme in the locality. 

3.4.2   Currently trading commercial organisations except for sponsorship names for facilities and leased parks.

3.4.3   Anagrams, amalgamations or derivatives of people's names.

3.4.4   Names of living persons.

3.4.5   Names related to the developer of a subdivision.

3.4.6   Name of a person, club or organisation associated with a privately owned building on Council land, where the club or organisation does not hold the ground lease for the building.

3.4.7   Names for roads which may cause confusion because they are associated with another geographical location or feature e.g., Parklands Drive which is not located in the Parklands suburb.

3.5       The recommended road name and alternatives have also been checked against the Australia and New Zealand Standard AS/NZA 4819:2011 Rural and Urban Addressing. The names are considered to be consistent with the Standard.

3.6       Under the Roads and Right-of-Way Naming Policy, the name considered must be requested by the developer. There is no ability to consider alternative names without first checking whether there are any duplications or similarities with other road and right-of-way names.

3.7       Consultation has been undertaken with Land Information New Zealand who have raised no concerns with the proposed names.

3.8       Consultation under the policy with rūnanga is not required because the road to be named is not a collector road and/or site(s) of significance under the District Plan (clause 3 of the Naming Policy).

3.9       No addresses of neighbouring properties are affected by the proposed road naming (clause 12.2 of the Naming Policy).

3.10    The names requested have been accompanied by an explanation of the background of the names, which is summarised below.


 

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.11    The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.12    The level of significance was determined by the number of people affected and/or with an interest.

3.13    Due to the assessment of low significance, no further community engagement and consultation is required.

Proposed Name

3.14    The proposed Lane is shown in Attachment A.

3.15    The proposed name and one of the alternative names are themed for attributes associated with the area.

3.16    Lane 1 - Claridgewood Lane

3.17    Claridgewood refers to the local environment, with the adjacent Claridges Road named for a landowner in the 1880’s, and ‘wood’ for the previous rural nature of the locality.

Alternative Names

3.18    Fernwood Lane - Fernwood refers to the pre-colonial native vegetative cover common to the locality.

3.19    Cedar Grove Lane - Cedar Grove refers to a stand or cluster of cedar trees.

3.20    The proposed name and the first of the alternative names are considered to be consistent with the policy. “Cedar Grove Lane” is not consistent as cedar trees are not known to be associated with the area (6.1.a).

3.21    Notwithstanding, the discretion lies with the Community Board to approve any of the above name options, including the alternative names.

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

RMA/2025/694 - Proposed Naming Plan - 132 Claridges Road

25/2304921

22

 

 

Signatories Ngā Kaiwaitohu

Authors

Leashelle Miller - Planner Level 2

Sean Ward - Team Leader Planning

Approved By

Mark Stevenson - Head of Planning & Consents

 

 


A blueprint of a land with many square areas

AI-generated content may be incorrect.


9.     Tree Removal in Bishopdale Mall

Reference Te Tohutoro:

25/2330417

Responsible Officer(s) Te Pou Matua:

Toby Chapman (Urban Forest Manager)

Accountable ELT Member Pouwhakarae:

Brent Smith, General Manager City Infrastructure

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is to seek approval for the removal of a number of trees located within the Bishopdale mall area to facilitate the redesign of the carpark area.

1.2       The report is in response to an ongoing request from the local supermarket to extend the footprint of their building into the existing carpark area that is currently designated as road reserve.

1.3       As the trees are healthy and structurally sound, the decision to remove the trees falls to the Community Board.

1.4       Under section 4.7 of the Councils Tree Policy, the Board may consider the removal of a Council tree for projects located on Council land.  The Board must take into account the benefits of the project against the benefits provided by the trees.

 

 

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receive the information in the Tree Removal in Bishopdale Mall Report.

2.         Notes that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Notes that the road stopping, tree removals, and carpark reconfiguration with associated landscaping to facilitate the redevelopment are interdependent.

4.         Notes that the Public Works Act 1981 will be used to stop the road, and that this process will be enacted under the delegated authority of the Property Consultancy Manager.

5.         Notes that the decisions in this report are conditional upon the developer entering into a sale and purchase agreement, together with a development agreement for the carpark, to purchase the portion of road to be stopped.

6.         The board approves the removal of the trees located within the carpark (ID’s 98396, 98375,98373 and four Pseudopanax) and reconfiguration of the carpark with additional Tree planting subject to the following conditions:

a)    The developer entering into a Sale and Purchase Agreement and a Project Development Agreement for the carpark works.

b)    The developer obtaining all necessary approvals and consents for the supermarket extension (as required under the S&P).

c)    Detailed carpark design meeting Council’s infrastructure and urban tree design standards—including provision for adequate tree planting and soil volume to meet the Councils Urban Forest Plant target of 20% canopy cover—and being approved by both the Transport Unit and the Urban Forest Manager.

d)    The developer provide for all additional tree planting required to meet the Councils Tree Replacement policy.

 

 

3.   Executive Summary Te Whakarāpopoto Matua

3.1       The local supermarket are investigating options to extend the size of the supermarket footprint by approximately 10m into the existing carpark.

3.2       If the supermarket is extended, it will require a carpark redesign as the building would occupy the area currently used for ingress and egress into the carpark.

3.3       To facilitate the extension of the building and the redesign of the carpark, a number of tree removals will be required including the removal of a large mature gum tree.

3.4       This report seeks to gain approval for the removal of these trees subject to a number of conditions being met.

 

4.   Background/Context Te Horopaki

4.1       The Bishopdale mall is located on the corner of Harewood Road and Farrington Avenue and includes a number of shopping centres within the area, one of which is the New World supermarket.

4.2       The developer has expressed an interest to extend the size of the supermarket building to meet the demand of the local area.  The developer’s preference is to extend the building footprint to the north by approximately 10m taking up a portion of the existing carpark.

4.3       This would take the building footprint very close to the base of an existing mature gum tree (ID:98396).  The extension of the building would also block of the existing access to the carpark triggering the requirement for a redesign of the car park.

4.4       In order for the carpark to be redesigned, tree removals would need to take place.  The purpose of this report is to provide a level of assurance to the developer that a redesign involving tree removal is possible.

4.5       The tree that is posing the greatest obstacle to the build and the carpark is the large mature gum tree.  The tree has been assessed by the Council’s Arborist who found it to be in good health and structurally sound. 

4.6       As there are no issues with the tree’s health or structure, the decision to remove the tree falls under the delegation of the Community Board under section 334 of the Council’s delegations register.

4.7       The attached concept design for the carpark shows the new entry and exit points will take up the location where trees are currently located and will require removal.

4.8       If this design proceeds, a total of six (6) trees will need to be removed.  Images of the trees are included below:


 

 

 

Tree ID: 98396

A large tree in a parking lot

AI-generated content may be incorrect.

 

Eucalyptus brookeriana (Brooker’s Gum)

Age Class: Mature

Height: 25m

Health: Good

Structure: Good

 

Tree ID: 98375

Parrotia persica (Persian Ironwood)

A tree with no leaves

AI-generated content may be incorrect.

 

 

Age Class: Mature

Height: 5.5m

Health: Fair

Structure: Fair

 

 


 

Aerial view of a parking lot

AI-generated content may be incorrect.

Tree ID: 98373

Malus trilobata (Thracian Apple)

A tree in a parking lot

AI-generated content may be incorrect.

Age Class: Mature

Height: 9.3m

Health: Good

Structure: Good

 

 

Tree ID: Un-plotted

Four Pseudopanax trees

Age Class: Mature

Height: 4m

Health: 1 Poor, 2 Fair, 1 Good

Structure: Fair

 

A group of trees in a parking lot

AI-generated content may be incorrect.

 

The image below provides an aerial image with the location of the trees:

4.9       The Council’s Tree Policy outlines when it will consider the removal to trees and how they will be replaced. 

4.10    Section 4.7 of the Tree Policy states:

“Approval by Council for the removal of trees to facilitate projects on Council land will take into account the value of the project to the community, including public health and/or the local environment and considerations taken for retaining existing trees compared with the loss of the benefits provide by the trees.

4.11    This report provides details to the Community Board which will allow them to assess the benefits of the project against the benefits that are provided by the tree along with how those benefits will be replaced overtime.

4.12    Trees generally provide a wide array of benefits, particularly those located within carparks.  Some of the key benefits provided by these trees are:

·    Amenity - Trees soften the surrounding built up environment

·    Managing stormwater – Trees reduce stormwater run-off particularly through heavy rain events by intercepting rainfall and slowing down the flow.

·    Cooling – Trees provide shading which in turn reduces heat build-up within the carpark and the parked vehicles.

4.13    The developer has highlighted that if they are not able to extend the footprint of the building, they will not be able to operate in the location and will have to consider relocating.

4.14    It is not possible within the current timeframes to assess the full impact that the supermarket relocating will have on the other commercial operators.  It is likely that its relocation will reduce the number of people who come into the area and this may have a flow on affect to the other operators.

4.15    A proposed condition to the approval that has been put forward by staff is to require that the approval to remove the tree will be subject to the new carpark layout incorporating new tree planting locations.

4.16    It is important to note that trees require a sufficient soil volume to grow healthy and meet their size potential.  There are a wide range of engineering solutions that allow trees to be planted within carpark environments without compromising on parking spaces. 

4.17    Specific wording has been included in the recommended conditions to require that any tree planting within the carpark provides sufficient soil volume to support the tree through to maturity.

4.18    While some tree planting will be able placed directly back into the carpark, it is unlikely that there will be sufficient space for the full 10 trees required under section 1.9 of the policy to be planted.  It is therefore recommended that the remaining trees are planted within the wider carpark area where available spaces currently exist.  Only once these spaces have been exhausted should planting outside of the carpark area be undertaken.

4.19    No consultation with the wider community or other commercial companies in the area has been undertaken as it was not possible to have this work completed within the required timeframes.


 

Road Stopping Application details:

4.20    The proposed road stopping relates to a portion of legal road within the Bishopdale Mall car park, required to enable redevelopment of the New World supermarket as part of the wider mall revitalisation. A plan is attached.

4.21    Staff have assessed the statutory options available (Local Government Act 1974 and Public Works Act 1981), along with the relevant clauses of Council’s Road Stopping Policy and determined that the proposal meets the requirements for use of the Public Works Act.

4.22    Consistent with practice, this report fulfils the notification requirement to the Community Board of road stoppings in their area where the Public Works Act and staff delegation are being used to give effect to the stopping and subsequent land sale. This provides an opportunity for the Board to raise any matters for consideration in exercising that delegation.

 

Options Considered Ngā Kōwhiringa Whaiwhakaaro

4.23    The following reasonably practicable options were considered and are assessed in this report:

4.23.1       Approve the removal of the trees subject to meeting the conditions outlined within the resolution.

4.23.2       Decline the removal of the trees.

4.23.3       Delay decision to allow time for consultation and further analysis.

4.24    The following options were considered but ruled out:

4.24.1       Approve removal with no replanting requirements – This option does not comply with the Councils Tree Policy which has a requirement for any tree being removed to have a minimum of two new trees planted and the canopy cover to be replaced within 20 years.

4.24.2       Approve the removal without any of the additional conditions – The conditions are in place to ensure the decision made complies with 4.7 of the Councils Tree Policy and the Urban Forest Plan. 

Options Descriptions Ngā Kōwhiringa

4.25    Preferred Option: Approve the removals subject to meeting the conditions outlined within this report.

4.25.1       Option Description: The trees will be approved for removal to allow for the supermarket to be extended and the carpark to be reconfigured.  The tree removal will not proceed until the developer has entered into a sales and purchase (S&P) agreement, obtained all necessary approval (required under the S&P) and provided detailed designs that allow for sufficient tree planting to take place.

4.25.2       Option Advantages

·     The supermarket is able to be extended to allow for the increased demand.

·     The carpark will be reconfigured to support new trees to be planted for the long term

·     The conditions ensure that the tree will only be removed following confirmation that the Supermarket extension and carpark reconfiguration will proceed.

·     The removals will be in alignment with the Councils Tree Policy.

4.25.3       Option Disadvantages

·     A number of large mature trees will be removed.

·     The many benefits provided by the trees will be lost and will not be replaced for a number of years.

4.26    Decline the removal of the trees.

4.26.1       Option Description: The Board may choose to decline the removal of the trees.

4.26.2       Option Advantages

·     The mature trees will be retained along with the many benefits they provide.

4.26.3       Option Disadvantages

·     The supermarket extension is unlikely to proceed and the supermarket may be relocated away from the shopping centre to a larger venue.

4.27    Delay removal to allow for consultation.

4.27.1       Option Description: The Board may choose to delay its approval to allow for public consultation and further analysis of the impact on the supermarket being moved.

4.27.2       Option Advantages

·     The Elected members will be better informed on the views of the local community.

·     Further analysis will provide the elected members with a greater understanding of the commercial impact from the supermarket on the rest of the shopping centre.

4.27.3       Option Disadvantages

·     Consultation could delay progress by months given the time of year.

·     The supermarket developer is eager to move this forward as quickly as possible.

 

Analysis Criteria Ngā Paearu Wetekina

4.28    Ability to allow the Supermarket to proceed with their development.

4.29    Compliance with the tree policy.

4.30    Retention of tree canopy.


 

5.   Financial Implications Ngā Hīraunga Rauemi

Capex/Opex Ngā Utu Whakahaere

 

Recommended Option

Option 2 - Decline

Option 3 - Delay decision

Cost to Implement

Nil (All costs are expected to be covered by the Developer)

Nil

Estimated $200-$10,000

Depending on level of consultation and market analysis

Maintenance/Ongoing Costs

Nil, the trees that are removed will no longer require maintenance, however the newly planted trees will require ongoing maintenance

N/A

Nil

Funding Source

N/A

N/A

TBC

Funding Availability

N/A

N/A

TBC

Impact on Rates

Nil

Nil

Nil

 

5.1       The sales and purchase agreement will outline the costs that will be associated to the development to ensure Council is not at a financial disadvantage.

6.   Considerations Ngā Whai Whakaaro

Risks and Mitigations Ngā Mōrearea me ngā Whakamātautau

6.1       There is a risk that without the additional conditions put in place that require the developer to proceed with the extension that a number of trees may be removed without sufficient reason to do so.  By keeping the conditions within the resolution, it is unlikely that the trees will be removed without the development proceeding.

6.2       The risk posed by the mature tree within the carpark has been raised by the developer.  Staff have assessed the tree and have not found any damaged or poorly formed branches which would indicate the tree is likely to have a branch failure.

Legal Considerations Ngā Hīraunga ā-Ture

6.3       Statutory and/or delegated authority to undertake proposals in the report:

6.3.1         The decision in in alignment with 4.7 of the Tree Policy which allows the Community Board to consider the tree for removal.

6.3.2         The decision to approve the removal of the tree falls within the Community Boards delegation.


 

 

6.4       Other Legal Implications:

6.4.1         The legal consideration is the Council decision making is subject to the principles set out in section 76-81 of the Local Government Act.  These principles include that the local authority must:

(a)       Seek to identify all reasonably practicable options for the achievement of the objective of a decision (section 77)

(b)       Assess the options in terms of their advantages and disadvantages (section 77)

(c)       Give consideration to the views and preferences of persons likely to be affected by, or to have an interest in, the matter (section 78)

6.5       The Council has discretion to make judgments about how to achieve compliance with the principles, in proportion to the significance of the matters affected; the extent to which alternative options are to be identified and assessed; and the extent and detail of the information to be considered (amongst other matters) i.e. decisions with less significant effects may justifiably be subject to a less stringent decision-making process than those with significant effects. 

6.6       The decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy

6.7       The Board have the discretion to seek staff undertake consultation prior to a decision being made.

 

Strategy and Policy Considerations Te Whai Kaupapa here

6.8       The required Decision:

6.8.1         Aligns with the Christchurch City Council’s Strategic Framework. The Tree removal will support business investment through the allowance for the Supermarket to extend.

6.8.2         Is assessed as Low significance based on the Christchurch City Council’s Significance and Engagement Policy.  The level of significance was determined by assessing the impact of the decision upon the wider community.

6.8.3         Is consistent with Council’s Plans and Policies. The decision to remove the tree will be in alignment with the Councils Tree Policy subject to the additional conditions also being adopted.  The replacement planting will include sufficient planting to meet the Councils Urban Forest Plan.

6.9       This report does not support the Council's Long Term Plan (2024 - 2034).

 

Community Impacts and Views Ngā Mariu ā-Hāpori

6.10    No consultation with the wider community has been undertaken.

6.11    The decision affects the following wards/Community Board areas:

6.11.1       Waimāero Fendalton-Waimairi-Harewood Community Board.

Impact on Mana Whenua Ngā Whai Take Mana Whenua

6.12    The  Decision does not involve a significant decision in relation to ancestral land, a body of water or other elements of intrinsic value, therefore this decision does not specifically impact Mana Whenua, their culture, and traditions.

6.13    The decision Does not involve a matter of interest to Mana Whenua and Will not impact on our agreed partnership priorities with Ngā Papatipu Rūnanga.

6.14    The trees are located within a carpark area and do not form part of an area of native forest.

Climate Change Impact Considerations Ngā Whai Whakaaro mā te Āhuarangi

6.15    The proposals in this report are unlikely to contribute significantly to adaptation to the impacts of climate change or emissions reductions.

6.16    The removal of the trees will have a negative impact on adaptation to climate change however with sufficient replacement planting and reconfiguration of the carpark, the impact will be short lived.

7.   Process Steps Ngā Mahinga ā-muri

Board Report finalised – Report incorporates clear explanation of the statutory pathway, the interdependency of the works, and the conditional nature of the decision.

7.1       Sale & Purchase Agreement (S&P) and Project Development Agreement (PDA)

Negotiated and agreed in principle.

Documents are signed subject to the following conditions:

Board decision to approve the tree removals and carpark reconfiguration

Completion of survey and issue of new title

Developer obtaining all required consents and regulatory approvals

Approval of detailed carpark design by Council’s Transport Unit and the Urban Forest Manager

Board decision – Board approves the tree removals and conceptual carpark design subject to the conditions in (ii)–(iv) above.

Developer satisfies conditions – Developer progresses the survey, consents, and detailed design, with Council review and sign-off where required.

7.2       Once the developer has satisfied all of the conditions set out above, staff will work with the developer to engage a Council approved contractor to carry out the removal of the trees.

 

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Bishopdale Supermarket Extention concept plan

25/2433803

33

 

 

In addition to the attached documents, the following background information is available:

Document Name – Location / File Link

Not applicable

 

 

 

 

Signatories Ngā Kaiwaitohu

Author

Toby Chapman - Manager Urban Forest

Approved By

Lynette Ellis - Head of Transport & Waste Management

Brent Smith - General Manager City Infrastructure

 

 


Aerial view of a parking lot

AI-generated content may be incorrect.


10.   Community Parks Rolling Renewal Programme

Reference Te Tohutoro:

25/2090152

Responsible Officer(s) Te Pou Matua:

Bridie Gibbings, Manager Operations – Capital Development Community Parks

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is to seek approval for the amended Waimaero Fendalton–Waimairi–Harewood Community Board’s four-year Community Parks Rolling Renewal Programme for FY26–FY29.

1.2       This approval will confirm the proposed four-year programme and lock in the programme for FY27, incorporating the changes proposed by members of the Fendalton–Waimairi–Harewood Community Board (Attachment A).

1.3       The report has been generated by staff and includes the proposed Community Parks Rolling Renewal Programme for FY26–FY29, incorporating feedback from the Waimaero Fendalton-Waimairi-Harewood Community Board members.

 

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Community Parks Rolling Renewal Programme Report.

2.         Notes that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves the Waimaero Fendalton-Waimairi-Harewood Community Boards Community Parks Rolling Renewal Programme (Attachment A).

 

3.   Executive Summary Te Whakarāpopoto Matua

3.1       The Community Parks Capital Rolling Renewal Programme provides a structured approach to maintaining and renewing park assets, ensuring they remain safe, functional, and fit for purpose. Asset renewals are prioritised primarily on condition, with the highest priority given to assets in poor condition or presenting safety risks. Additional factors, including community use, asset importance, and age, are also considered in determining renewal priorities.

3.2       Programme delivery is further informed by cost, funding availability, project timing, and statutory or legal requirements. This enables a coordinated and efficient approach to renewal across the parks network.

3.3       Staff presented the draft programme to the Community Board to seek feedback on local priorities. The programme has subsequently been refined to incorporate this feedback, ensuring alignment with both community expectations and Council objectives.

3.4       The projects included in the Community Parks Rolling Renewal Programme are as follows:

·    Waimaero Fendalton-Waimairi-Harewood Local Play Space Renewals (#73983)

·    Community Parks - Planned Play Item Renewals (#64749)

·    Community Parks Green Asset Renewals (#43687)

·    Community Parks Hard Surface Renewals (#43686 - Footpaths and Carparks)

·    Individual projects containing play space, green or hard surface asset renewals.

 

4.   Background/Context Te Horopaki

4.1       During the deliberation of the FY2024–25 Annual Plan, elected members expressed concerns about the lack of visibility into individual renewal candidates within the Parks Rolling Renewal Programmes. In response, the Parks Unit committed to visiting all Community Boards annually to gather feedback on the proposed Rolling Renewal Programmes.

4.2       Last year staff presented the draft Parks Rolling Renewal Programmes to seek feedback on the plan. Requested alternations by the community board members were implemented.

4.3       To enhance transparency in the rolling renewal programme, staff amended the process so that the programme can be formally agreed once all requested alterations have been implemented.

4.4       Staff attended the Waimaero Fendalton-Waimairi-Harewood Workshop on 25 August 2025 to present the draft Community Park Rolling Renewal Programme (Attachment B). The board was given one month to submit feedback on the programme, including any suggested amendments.

4.5       Staff received two amendment requests:

4.5.1   Include Elmwood Park playground to the Play Space Renewal Programme. This has been added to the FY29 programme.

4.5.2   Pinehurst Reserve playground has been brought forward by one year, from FY28–FY29 to FY27–FY28. To accommodate this change, Ashcroft Reserve play space renewal has been deferred by one year, from FY27–FY28 to FY28–FY29.

4.6       The following related memos/information were circulated to the meeting members:

Date

Subject

25/8/2025

Draft Rolling Renewal Programme (Attachment B)

 

4.7       The following related information session/workshops have taken place for the members of the meeting:

Date

Subject

25/8/2025

https://christchurch.infocouncil.biz/Open/2025/08/ISWF_20250825_AGN_10097_AT_WEB.htm

 

Options Considered Ngā Kōwhiringa Whaiwhakaaro

4.8       The following reasonably practicable options were considered and are assessed in this report:

4.8.1         The Community Board adopt the proposed Community Parks Rolling Renewal Programme FY26-FY29.

4.8.2         The Community Board does not approve the proposed Community Parks Rolling Renewal Programme FY26-FY29 and requests that staff consider further amendments.


 

4.9       The following options were considered but ruled out:

4.9.1         Do not renew the proposed assets – choosing not to renew these assets would pose a risk to public safety and reduce levels of service.

Options Descriptions Ngā Kōwhiringa

4.10    Preferred Option: The Community Board adopt the proposed Community Parks Rolling Renewal Programme FY26-FY29.

4.10.1       Option Description: Approve the proposed programme.

4.10.2       Option Advantages

·     The assets identified for renewal that have come to the end of their life can be renewed to ensure levels of service are met.

·     Engagement with the Community Board ensures the programme reflects local priorities and expectations.

·     The structured process, including formal agreement after requested alterations, enhances transparency and accountability in how renewal decisions are made.

4.10.3       Option Disadvantages

·     There are no specific disadvantages to this option.

4.11    Option Two: The Community Board does not approve the proposed Community Parks Rolling Renewal Programme FY26-FY29.

4.11.1       Option Description: The Community Board does not approve the proposed Community Parks Rolling Renewal Programme FY26-FY29 and requests that staff consider further amendments.

4.11.2       Option Advantages

·     Further investigation into the reprioritisation of asset renewal can take place

4.11.3       Option Disadvantages

·     Delay to the asset renewal programme, potentially resulting in budget underspend

 

Analysis Criteria Ngā Paearu Wetekina

4.12    The programme is evaluated against key criteria to ensure safe, efficient, and community-focused asset renewal:

·   Safety & Asset Condition: High priority given to assets in poor condition or posing safety risks

·   Community Use & Importance: Assets supporting significant community activity are prioritised to maintain service levels

·   Cost, Funding & Timing: Renewal projects are assessed for feasibility, funding availability, and coordinated delivery

·   Legal Compliance: All renewals meet statutory and health and safety requirements

·   Community Feedback: The programme has been refined based on Community Board input to reflect local priorities

·   Long-Term Sustainability: Planned renewals extend asset life and reduce reactive maintenance costs.

4.13    The rolling renewal programme provides a transparent, structured, and sustainable approach, balancing immediate safety and service needs with long-term asset management and community expectations.

5.   Financial Implications Ngā Hīraunga Rauemi

Capex/Opex Ngā Utu Whakahaere

 

Recommended Option

Option 2

Cost to Implement

 

 

Waimaero Fendalton-Waimairi-Harewood Local Play Space Renewals (#73983)

Budget available across financial years 26-29 - $452,233

 

Budget available across financial years 26-29 - $452,233

 

Community Parks - Planned Play Item Renewals (#64749)

Budget available across financial years 26-29 - $1,027,176

Budget available across financial years 26-29 - $1,027,176

Community Parks Green Asset Renewals (#43687)

Budget available across financial years 26-29 - $3,390,240

Budget available across financial years 26-29 - $3,390,240

Community Parks Hard Surface Renewals (#43686 - Footpaths and Carparks)

Budget available across financial years 26-29 - $3,504,550

Budget available across financial years 26-29 - $3,504,550

Maintenance/Ongoing Costs

N/A – No change

N/A – No change

Funding Source

LTP

LTP

Funding Availability: 43686, 43687, 64749, 73980

 

 

Impact on Rates

No impact

No impact

 

5.1       It is important to note that the above costs allocated to implementing the renewal programme is set at a city-wide level, except for the Local Play Space Renewals Projects which are allocated per Community Board. Costs are allocated at the programme level once work has been competitively priced.

6.   Considerations Ngā Whai Whakaaro

Risks and Mitigations Ngā Mōrearea me ngā Whakamātautau

6.1       In relation to construction, no specific risks have been identified other than those ordinarily associated with managing work in a public park environment

Legal Considerations Ngā Hīraunga ā-Ture

6.2       Statutory and/or delegated authority to undertake proposals in the report:

6.2.1   Under the Reserves Act, staff hold the delegation to renew assets within an existing reserve that does not alter the original landscape. However, staff are seeking approval from the Waimaero Fendalton-Waimairi-Harewood Community Board for the rolling renewal programme, to provide greater transparency in the renewal process.

6.3       Other Legal Implications:

6.3.1   There is no legal context, issue, or implication relevant to this decision.

Strategy and Policy Considerations Te Whai Kaupapa here

6.4       The required decision aligns with:

6.4.1   The Christchurch City Council’s Strategic Framework that our residents have the opportunity to actively participate in community and city life, have a strong sense of belonging and identity, and feel safe.

6.4.2   Is consistent with Council’s Plans and Policies: Physical Recreation and Sports Strategy 2022.

6.4.3   Are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

6.5       This report supports the Council's Long Term Plan (2024 - 2034):

6.6       Parks, Heritage and Coastal Environment

6.6.1   Activity: Parks and Foreshore

·     Level of Service: 6.0.1 All Community Parks are managed and maintained in a clean, tidy, safe, functional, and equitable manner (Maintenance) - 90% Maintenance Plan key performance indicators are achieved

·     Level of Service: 6.8.2.3 Parks are managed and maintained in a clean, tidy, safe, functional, and equitable manner (Asset Performance) - At least 90% of parks and associated public recreational assets are available for safe public use during opening hours  

Community Impacts and Views Ngā Mariu ā-Hāpori

6.7       No community feedback and been sought, as the programme does not increase levels of service and renewed assets are replaced like for like.

6.8       Staff will initiate community consultation to the Play Space Renewal Projects

Impact on Mana Whenua Ngā Whai Take Mana Whenua

6.9       The decision does not involve a significant decision in relation to ancestral land, a body of water or other elements of intrinsic value, therefore this decision does not specifically impact Mana Whenua, their culture, and traditions.

6.10    The decision does not involve a matter of interest to Mana Whenua and will not impact on our agreed partnership priorities with Ngā Papatipu Rūnanga.

6.11    The decision affects the following wards/Community Board area: Waimaero Fendalton-Waimairi-Harewood Community Board

Climate Change Impact Considerations Ngā Whai Whakaaro mā te Āhuarangi

6.12    The decisions in this report are likely to:

6.12.1       Contribute positively to adaptation to the impacts of climate change

6.12.2       Contribute positively to emissions reductions.

6.13    Widespread planting of shrubs, grasses, wetlands species, and groundcovers play an important role in mitigating climate change by sequestering carbon and reducing ‘heat island’ effect.

7.   Next Steps Ngā Mahinga ā-muri

7.1       Once the programme is adopted, staff will begin scoping future locations for both green asset and hard asset renewals and will initiate early engagement on upcoming playground renewals.

 

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Proposed Rolling Renewal Program

25/2073238

41

b

Draft Rolling Renewal Programme - Not amended

25/2430818

44

 

 

In addition to the attached documents, the following background information is available:

Document Name – Location / File Link

Not applicable

 

 

 

 

Signatories Ngā Kaiwaitohu

Author

Bridie Gibbings - Manager Operations - Parks Development

Approved By

Al Hardy - Manager Community Parks

 

 


A green and white form with white text

AI-generated content may be incorrect.

A close-up of a document

AI-generated content may be incorrect.

A close-up of a document

AI-generated content may be incorrect.


A green and white document with text

AI-generated content may be incorrect.

A screenshot of a computer

AI-generated content may be incorrect.

A screenshot of a computer

AI-generated content may be incorrect.

A screenshot of a computer

AI-generated content may be incorrect.


11.   Dedication of Local Purpose Reserve (Road) 3 R Tulett Park Drive Casebrook

Reference Te Tohutoro:

25/1883169

Responsible Officer(s) Te Pou Matua:

Colin Windleborn Property Consultant

Accountable ELT Member Pouwhakarae:

Brent Smith, General Manager City Infrastructure

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is to seek a resolution under Section 111 of the Reserves Act 1977 for the dedication of Local Purpose Reserve (Road), described as 3R Tulett Park Drive Lot 160 DP 499649 Certificate of Title 768569, as road. Attachment A

1.2       In 2018 a subdivision was undertaken which created a Local Purpose Reserve (Road) to allow for the future construction of Tulett Park Drive- Lot 160 DP 499649 Certificate of Title 768569. Attachment B

1.3       Adjacent land has now been subdivided under resource consent RMA/2021/3245/A, which requires Lot 160 DP 499649 Certificate of Title 768569 to be formed as road and vested in Council. Attachment C

1.4       The road is now formed over the Local Purpose Reserve (Road) and therefore requires dedication as a road. Attachment D

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board recommend that Council:

1.         Receives the information in the Dedication of Local Purpose Reserve (Road) 3 R Tulett Park Drive Casebrook Report.

2.         Notes that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Resolves pursuant to Section 111 of the Reserves Act 1977 to dedicate the Local Purpose Reserve (Road) containing 203m² described as 3R Tulett Park Drive Lot 160 DP 499649 Certificate of Title 768569 as road.

4.         Authorises the Manager Property Consultancy to take all steps necessary to complete all necessary documentation to conclude the dedication of Lot 160 DP 499649 Certificate of Title 768569 as road.

 

3.   Executive Summary Te Whakarāpopoto Matua

3.1       When vacant land is being developed, consideration is given to future roading patterns for adjacent areas that have not yet been developed.

3.2       This is achieved by the developer providing an allotment which vests in Christchurch City Council as Local Purpose Reserve (Road).

3.3       The land remains in this status until such time as adjoining land is developed.

3.4       For Tulett Park Drive Lot 160 DP 499649 Certificate of Title 768569 was vested as Local Purpose Reserve (Road) and remained in grass.

3.5       The adjoining land is being subdivided which requires the Local Purpose Reserve (Road) to be formed and vested as road in order to provide a through road.

3.6       The recommendation in this report to Council, if adopted, will allow for the legalisation of the Local Purpose Reserve (Road) as road.

 

4.   Background/Context Te Horopaki

4.1       Tulett Park Drive is located within the suburb of Casebrook between Claridges and Styx Mill Road 1.7km west of state highway 74 (Main North Road).

4.2       As undeveloped land is subdivided, roads are progressively formed and vested in Christchurch City Council.

4.3       When subdivision of land is staged, allowance must be made for future connectivity of roads to adjoining land.

4.4       This is achieved by the subdivider providing land which vests in Council as Local Purpose Reserve (Road) and would be formed when the adjoining land is subdivided.

4.5       At the end of Tulett Park Drive is Lot 160 DP 499649 which vested in Christchurch City Council as Local Purpose Reserve (Road) to separate Tulett Park Drive and vacant land to the North.

4.6       In 2021 resource consent RMA/2021/3245/A was granted for the development of this vacant land.

4.7       The Local Purpose Reserve (Road) to be formed to enable Tulett Park Drive to be a through Road. Attachment C shows a photo of the site as it was prior to the road being constructed, and a recent photo showing the road being formed.

4.8       The adoption of the resolution in this report will allow the legalisation of the Local Purpose Reserve (Road)as road.

Options Considered Ngā Kōwhiringa Whaiwhakaaro  

4.9       The following reasonably practicable options were considered and are assessed in this report:

4.9.1   Option 1: Recommended. Dedicate the Local Purpose Reserve (Road) as road.

4.10    The following option was considered but ruled out:

4.10.1 Option Description Status Quo – Do nothing

4.10.2 Option Advantage: There is no advantage.

4.10.3 Option Disadvantage:

·     Council is legally bound to declare the Local Purpose Reserve (Road) as road.

·     Would create a reputational risk as there is a resource consent which states that the land is to be road

Options Descriptions Ngā Kōwhiringa

4.11    Preferred Option: Option 1: Dedicate the Land as Road.

4.11.1 Option Description: Undertake the process to legalise the land as road.

4.11.2 Option Advantages

·     Compliance with the resource consent.

·     Road has been formed therefore no reputational risk

4.11.3 Option Disadvantages

·     No disadvantages.

Analysis Criteria Ngā Paearu Wetekina

4.12    Not required.

5.   Financial Implications Ngā Hīraunga Rauemi

Capex/Opex Ngā Utu Whakahaere

 

Status Quo

Recommended Option

Cost to Implement

$0

$1500

Maintenance/Ongoing Costs

Minimum given area 203m2

Minimum given area 203m2

Funding Source

Operational

Operational

Funding Availability

Current budget

Current budget

Impact on Rates

nil

nil

 

5.1       The area of the Local Purpose Reserve (Road) is 203m2 with minimum if any impact on overall transport budget.

6.   Considerations Ngā Whai Whakaaro

Risks and Mitigations Ngā Mōrearea me ngā Whakamātautau

6.1       The decision has no risk or mitigation with more risk if Council does not undertake the legalisation.

Legal Considerations Ngā Hīraunga ā-Ture

6.2       Statutory and/or delegated authority to undertake proposals in the report:

6.2.1   Section 111 of the reserves act gives Council the authority to pass a resolution and then lodge this with the Registrar-General of Land.

6.3       Other Legal Implications:

6.3.1   Christchurch City Council is the registered owner of the land which vested as Local Purpose Reserve (Road) in it by way of the subdivision undertaken in 2018.

6.3.2   There is no other legal context, issue, or implication relevant to this decision.

Strategy and Policy Considerations Te Whai Kaupapa here

6.4       The required decision:

6.4.1   Aligns with the Christchurch City Council’s Strategic Framework.

6.4.2   Is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.  The level of significance was determined by assessing the impact of dedicating the land as road on the public and budgets.

6.4.3   Is consistent with Council’s Plans and Policies. Manages ratepayers’ money wisely by delivering quality core services to the whole community and addressing the issues that are important to our residents.

6.5       This report supports the Council's Long Term Plan (2024 - 2034):

6.6       Transport

6.6.1   Activity: Transport

·     Level of Service: 10.5.42 Increase the infrastructure provision for active and public modes - >= 635 kilometres (total combined length)

·     Level of Service: 16.0.2 Improve roadway condition, to an appropriate national standard, measured by smooth travel exposure (STE)(DIA 2) - >=75% of the sealed local road network meets the appropriate national standard  

Community Impacts and Views Ngā Mariu ā-Hāpori

6.7       The decision in this report enables a requirement of resource consent RMA/2021/3245/A which would have addressed all community impacts and views.

6.8       The decision affects the following wards/Community Board areas:

6.8.1   Waimāero Fendalton-Waimairi-Harewood Community Board.

6.9       The report is being presented to this board for their consideration with a recommendation to Council.

Impact on Mana Whenua Ngā Whai Take Mana Whenua

6.10    The decision does not involve a significant decision in relation to ancestral land, a body of water or other elements of intrinsic value, therefore this decision does not specifically impact Mana Whenua, their culture, and traditions.

6.11    The decision does not involve a matter of interest to Mana Whenua and will not impact on our agreed partnership priorities with Ngā Papatipu Rūnanga.

6.12    The decision is an enabling one which will legalise land which is currently Local Purpose Reserve Road which has been formed as road following an adjacent subdivision.

Climate Change Impact Considerations Ngā Whai Whakaaro mā te Āhuarangi

6.15    The proposals in this report are unlikely to contribute significantly to adaptation to the impacts of climate change or emissions reductions.

6.16    The road is already formed and will provide a through road rather than two cul de sacs.

 

7.   Next Steps Ngā Mahinga ā-muri

7.1       Lodge the resolution under Section 111 of the Reserves Act 1977 with the Registrar-General of Land

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Attachment A - Tulett Park Drive

25/1906450

54

b

Attachment B - Location of Local Purpose Reserve (Road) Lot 160

25/1883750

55

c

Attachment C - Plan of Subdivision Adjacent Land

25/1884026

56

d

Attachment D - Aerial and Street View

25/1885828

57

 

 

In addition to the attached documents, the following background information is available:

Document Name – Location / File Link

Not applicable

 

 

 

 

Signatories Ngā Kaiwaitohu

Author

Colin Windleborn - Property Consultant

Approved By

Angus Smith - Manager Property Consultancy

Andy Milne - Team Leader Asset Planning

Lynette Ellis - Head of Transport & Waste Management

 

 



A blueprint of a neighborhood

AI-generated content may be incorrect.


A blueprint of a land plan

AI-generated content may be incorrect.



A screenshot of a road with a yellow and black warning sign

AI-generated content may be incorrect.


 

12.   Athol Terrace - Proposed No Stopping Restrictions

Reference Te Tohutoro:

25/931505

Responsible Officer(s) Te Pou Matua:

Andrew Hensley, Traffic Engineer

Accountable ELT Member Pouwhakarae:

Brent Smith, General Manager City Infrastructure

  

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is to seek the approval of the Waimaero Fendalton Waimairi Harewood Community Board to install no stopping restrictions on Athol Terrace.

1.2       This report has been written following requests to improve visibility at the main vehicle crossing to the Parkstone Retirement Village.

1.3       The community engagement and consultation outlined in the report reflect the significance.

1.4       The recommended option is to install no stopping restrictions, and reinstate the remaining P15 parking restrictions, in accordance with Attachment A.

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Athol Terrace - Proposed No Stopping Restrictions Report.

2.         Notes that the decision in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         In accordance with Clause 6(2) of the Christchurch City Council Traffic and Parking Bylaw 2017 revokes any previous resolutions pertaining to traffic controls made pursuant to any bylaw to the extent that they are in conflict with the parking or stopping restrictions described in resolutions 4 – 7 below.

4.         Approves that in accordance with Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017 that the parking of vehicles be restricted to a maximum period of 15 minutes,  on the south western side of Athol Terrace, commencing at a point 33 metres north west of its intersection with Peer Street and extending in a north westerly direction for a distance of 54  metres, as detailed on Attachment A to this report on the meeting agenda (Plan TG149452 Issue 1 dated 18/11/25). This restriction is to apply 8am-6pm, 7 days.

5.         Approves that in accordance with Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017, that the stopping of vehicles be prohibited at any time on the south western side of Athol Terrace, commencing at a point 87 metres north west of its intersection with Peer Street and extending in a north westerly direction for a distance of 23 metres, as detailed on Attachment A to the report on the meeting agenda (Plan TG149452 Issue 1 dated 18/11/25).

6.         Approves that in accordance with Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017, that the stopping of vehicles be prohibited at any time on the south western side of Athol Terrace, commencing at a point 119 metres north west of its intersection with Peer Street and extending in a north westerly direction for a distance of 9 metres, as detailed on Attachment A to the report on the meeting agenda (Plan TG149452 Issue 1 dated 18/11/25).

7.         Approves that in accordance with Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017 that the parking of vehicles be restricted to a maximum period of 15 minutes, on the south western side of Athol Terrace, commencing at a point 39 metres south east of its intersection with Brodie Street and extending in a south easterly direction for a distance of 39 metres, as detailed on Attachment A to the report on the meeting agenda (Plan TG149452 Issue 1 dated 18/11/25). This restriction is to apply 8am-6pm, 7 days.

8.         Approves that these resolutions take effect when parking signage and/or road markings that evidence the restrictions described in this staff report are in place (or removed in the case of revocations).

 

3.   Executive Summary Te Whakarāpopoto Matua

3.1       Safety concerns have been raised by residents of the Parkstone Retirement Village due to restricted visibility when vehicles are parking near the main vehicle crossing on Athol Terrace.  Implementing the noted recommendations will lead to a reduction in the risk of a crash by improving sightlines for exiting vehicles.

3.2       The recommended option is to install no stopping restrictions in accordance with Attachment A. 

3.3       The recommendations in this report will help to achieve the desired community outcome of a well-connected and accessible city through improved road safety.

3.4       Options within this report have been assessed against relevant industry-standard design guidance including the sight distance requirements.

4.   Background/Context Te Horopaki

4.1       Athol Terrace is a collector road within the suburb of Ilam.

4.2       Athol Terrace is on the boundary between the Waimairi and Riccarton wards. The northeastern side of Athol Terrace is within the Waipuna Halswell Hornby Riccarton Community Board area, and the southwestern side of Athol Terrace is within the Waimaero Fendalton Waimairi Harewood Community Board area.

4.3       The Parkstone Retirement Village is a large complex providing a range of accommodation and care services for the elderly. As a result, this site is anticipated to have a higher proportion of elderly and visitors, who may be unfamiliar with the area when utilising the main vehicle crossing.

4.4       The Retirement Village is undergoing a redevelopment at present which will increase the number of residents, staff, service and visitor vehicle movements.

4.5       Visibility can be limited for vehicles exiting the main Retirement Village vehicle crossing onto Athol Terrace if vehicles are parking close to the main vehicle crossing. Site visits have been undertaken to view the situation. Typically, parking demand within this area is relatively low at present but is likely to change as the site develops.

4.6       There is an existing P15 parking restriction on the southwestern side of Athol Terrace, which is understood to be a remnant from when the site was a carpet factory. This provides short stay parking opportunities to the immediate area, while discouraging longer stay parking.

4.7       Whilst functional, this parking restriction is now considered out of context, and it would benefit from being included within a forthcoming broader review of parking restrictions in the area surrounding the University of Canterbury. Typically, an area such as this would have a P120 parking restriction on one side and unrestricted parking on the other.  However, in the interests of progressing the ‘no stopping’ restriction it is recommended that the remaining P15 are left in place at this time.

4.8       There has been one reported crash in the last five years in the vicinity of the retirement village entrances. This crash is unrelated to the visibility concerns.

4.9       A traffic count was undertaken to assist in further assessing risk and priority for this project, both of which are considered low. The average daily traffic volume was 3508 vehicles per day, and the average and 85 percentile speeds 32.0km/h and 36.9 km/h respectively.

4.10    Ongoing site visits have not indicated a significant change in the level of risk and priority, but given the ongoing community interest, and site development being underway, improvements are recommended.

4.11    If approved, the recommendations will be implemented within the current financial year (generally around four weeks after the contractor receives the request, but this is subject to other factors such as resourcing and prioritisation beyond Council’s control).

Options Considered Ngā Kōwhiringa Whaiwhakaaro

4.12    The following reasonably practicable options were considered and are assessed in this report:

4.12.1 Preferred Option

4.12.2 Consultation Option

4.12.3 Do Nothing

Options Descriptions Ngā Kōwhiringa

4.13    Preferred Option: Install no stopping restrictions and reinstate remaining P15 parking restriction.

4.13.1 Option Description: Install no stopping restrictions on both sides of the main vehicle crossing, and reinstate remaining P15 parking restrictions.

4.13.2 Option Advantages

·     Improves visibility at the main vehicle crossing, and future proofs this location for increased usage.

·     Retains the remaining P15 parking restrictions.

4.13.3 Option Disadvantages

·     Removes approximately five parking spaces.

·     The P15 parking restrictions do not align with current best practice for these situations.

4.14    Consultation Option: Install no stopping restrictions and P120 parking restrictions.

4.14.1 Option Description: Install no stopping restrictions and replace the existing P15 parking restrictions with P120 parking restrictions.

4.14.2 Option Advantages

·     Improves visibility at the main vehicle crossing.

·     Future proofs this location for increased usage.

·     Removes the existing P15 parking restrictions which don’t align with current best practice for these situations (P120 or no parking restrictions).

4.14.3 Option Disadvantages

·     Removes approximately five parking spaces.

·     Replacing the existing P15 parking spaces with a P120 parking restriction is unpopular with local residents.

4.15    Option 3- Do nothing

4.15.1 Option Description: No changes made to on street parking.

4.15.2 Option Advantages

·     Retains approximately five P15 on street parking spaces. However, it is noted that these spaces have been observed to be only occasionally occupied and never fully occupied, and there is a surplus of on street parking opportunities in the immediate vicinity.

4.15.3 Option Disadvantages

·     Does not address requests to improve visibility at the main vehicle crossing.

·     Does not future proof this location for increased usage.

·     Does not align the P15 parking restrictions with current best practice for these situations.

 

5.   Financial Implications Ngā Hīraunga Rauemi

Capex/Opex Ngā Utu Whakahaere

 

Recommended Option

Option 2 – Consultation Option

Option 3 – Do Nothing

Cost to Implement

Approximately $1200

Approximately $1800

$0

Maintenance/Ongoing Costs

Covered by the existing Maintenance Contract

Covered by the existing Maintenance Contract

$0

Funding Source

Traffic Operations Team traffic signs and markings budget

Traffic Operations Team traffic signs and markings budget

N/A

Funding Availability

Available

Available

N/A

Impact on Rates

N/A

N/A

N/A

 

6.   Considerations Ngā Whai Whakaaro

Legal Considerations Ngā Hīraunga ā-Ture

6.1       Statutory and/or delegated authority to undertake proposals in the report:

6.1.1   Part 1, Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017 provides Council with the authority to install parking or stopping restrictions by resolution.

6.1.2   The Community Boards have delegated authority from the Council to exercise the delegations as set out in the Delegations Register. The list of delegations for the Community Boards includes the resolution of stopping and traffic control devices.

6.1.3   Clause 6(2) of the Christchurch City Council Traffic and Parking Bylaw 2017 provides Council with the authority to subsequently amend or revoke any resolution made under this bylaw at any time.

6.1.4   The installation of any signs and/or markings associated with traffic control devices must comply with the Land Transport Rule: Traffic Control Devices 2004.

6.2      Other Legal Implications:

6.2.1   There is no other legal context, issue, or implication relevant to this decision.

6.2.2   This specific report has not been reviewed and approved by the Legal Services Unit however the report has been written using a general approach previously approved of by the Legal Services Unit, and the recommendations are consistent with the policy and legislative framework outlined in this report.

Strategy and Policy Considerations Te Whai Kaupapa here

6.3       The required decisions:

6.3.1   Align with the Christchurch City Council’s Strategic Framework.

6.3.2   The recommendations in this report are consistent with the Christchurch Suburban Parking Policy.

6.3.3   The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy. The level of significance was determined by the low level of impact and low number of people affected by the recommended decision.

6.4       The community engagement and consultation outlined in this report reflect the assessment.

6.5       This report supports the Council's Long Term Plan (2024 - 2034):

6.6       Transport

6.6.1   Activity: Transport

·   Level of Service: 10.0.6.1 Reduce the number of death and serious injury crashes on the local road network (DIA 1) - 4 less than previous FY  

Community Impacts and Views Ngā Mariu ā-Hāpori

6.7       Requests were received from Parkstone Retirement Village to improve visibility at their main vehicle crossing.

6.8       Traffic Operations staff met with residents and management of Parkstone Retirement Village to discuss the access concerns and to consider options.

6.9       A consultation plan was developed (see attachment B) which addressed the concerns about the visibility. It also took the opportunity to propose changes to the existing P15 parking restriction to better align these spaces with best practice.

6.10    In April 2025 property owners and residents in the immediate vicinity were consulted by way of a letter drop and mailout to absentee owners. It was also circulated by the Retirement Village.

6.11    Responses were received from four stakeholders. These comprised a representative of the Retirement Village residents, the Retirement Village manager, and the owners of two properties opposite the Retirement Village.

6.12    Follow up correspondence with respondents was undertaken to seek clarification of the issues raised. Ongoing site visits have occurred since to establish the extent and frequency of these.

6.13    Support for the no stopping and proposed P120 parking restrictions was received from the representative of the retirement village residents. Concern was however raised about the proposed hours of operation, in particular the presence of unrestricted parking during the weekend and evenings. In practice, the existing P15 parking restrictions operate on standard hours of 8am- 6pm Monday- Sunday, which allow for unrestricted overnight parking.

6.14    The Manager of the Retirement Village acknowledged the consultation and advised they had circulated to the working group, and would advise the wider Village.

6.15    The owner of one property opposite objected to the proposal due to the following reasons:

6.15.1 Traffic volume on Athol Terrace

6.15.2 View that with vehicles parking on both sides that Athol Terrace is reduced to one lane due to the existing kerb and dish channel.

6.15.3 Lack of enforcement of the existing P15 parking restrictions.

6.15.4 Don’t support the proposed P120.

6.15.5 Visitors and staff of the Retirement Village should be accommodated on site.

6.15.6 Council must address safety for cyclists and remove the parking on the southwestern side of Athol Terrace.

6.16    The owners of another property opposite objected to the proposal due to:

6.16.1 Their belief it was a “dangerous proposal”.

6.16.2 It would turn Athol Terrace into a one lane road as two cars can’t travel down the street (due to parked vehicles).

6.16.3 The proposed March to November operation of the P120.

6.16.4 Trucks, and many cyclists and walkers on Athol Terrace.

6.16.5 Vehicles exiting the Retirement Village not having a clear view due to an increase in parked vehicles.

6.16.6 Proposal only benefits the Retirement Village.

6.17    A number of issues were also raised which are considered outside the scope of this project, which have been referred to the relevant staff.

6.18    In the interests of progressing the proposed no stopping restrictions at the Retirement Village vehicle crossings, it is recommended to install the proposed no stopping restrictions, but not to make changes to the P15 parking restriction, at this point in time. This is reflected in the preferred option (Attachment A).

6.19    Staff have also reviewed the traffic safety and access issues raised on Athol Terrace and do not recommend any further changes.

6.20    The Team Leader Parking Compliance supports the preferred option. 

6.21    The decision affects the following wards/Community Board areas:

6.21.1 Waimero Fendalton Waimairi Harewood Community Board.

Impact on Mana Whenua Ngā Whai Take Mana Whenua

6.22    The decisions do not involve a significant decision concerning ancestral land or a body of water or other elements of intrinsic value, therefore this decision does not specifically impact Mana Whenua, their culture and traditions.

6.23    The decision does not involve a matter of interest to Mana Whenua and will not impact on our agreed partnership priorities with Ngā Papatipu Rūnanga.

Climate Change Impact Considerations Ngā Whai Whakaaro mā te Āhuarangi

6.16    The proposals in this report are unlikely to contribute significantly to adaptation to the impacts of climate change or emissions reductions.

6.17    This is a minor proposal that is principally designed to improve access and safety at this location. Due to the minor nature of the works, it is not expected to have any impact on climate change.

7.   Next Steps Ngā Mahinga ā-muri

7.1       If approved, staff will arrange for the new road markings and amended parking signage to be installed.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Athol Terrace Proposed Parking Restriction Changes Plan TG149452

25/2370604

66

b

Athol Terrace Proposed Parking Restriction Changes Consultation Plan TG149452

25/2370633

67

 

 

In addition to the attached documents, the following background information is available:

Document Name – Location / File Link

Not applicable

 

 

 

 

Signatories Ngā Kaiwaitohu

Author

Andrew Hensley - Traffic Engineer

Approved By

Lachlan Beban - Principal Advisor Transportation Signals

Kathy Graham - Team Leader Traffic Operations

Stephen Wright - Manager Operations (Transport)

 

 




 

13.   Clyde Road Parking Restrictions

Reference Te Tohutoro:

25/1806861

Responsible Officer(s) Te Pou Matua:

Ashley Beaton, Community Travel Advisor

Accountable ELT Member Pouwhakarae:

Brent Smith, General Manager City Infrastructure

  

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       For the Waimāero Fendalton-Waimairi-Harewood Community Board to approve the conversion of existing P1 parking restrictions on Clyde Road adjacent to Tūora Fendalton School to P3 parking restrictions in accordance with Attachment A.

1.2       The decisions in this report are of low significance in relation to the Christchurch City Council’s Significance and Engagement Policy. The level of significance was determined by the low level of impact and low number of people affected by the recommended decision.

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Clyde Road Parking Restrictions Report.

2.         Notes that the decision in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Revokes any previous resolutions pertaining to traffic controls made pursuant to any bylaw to the extent that they are in conflict with the parking or stopping restrictions described in resolutions 4 below.

4.         Approves that the parking of all vehicles be restricted to a maximum period of 3 minutes, in accordance with Clause 8 of the Christchurch City Council Traffic & Parking Bylaw 2017, on the east side of Clyde Road commencing at a point 211 metres north of its intersection with Fendalton Road and extending in an northerly direction for a distance of 45 metres as detailed in Attachment A (TG151649, Issue 1, dated 01/09/2025). This is to apply between 8:30am – 9:30am and 2:30pm – 3:30pm on School Days Only.

5.         Approves that these resolutions take effect when parking signage and/or road markings that evidence the restrictions described in this staff report are in place.

 

3.   Executive Summary Te Whakarāpopoto Matua

3.1       This report recommends the conversion of existing P1 parking restrictions on Clyde Road adjacent to Tūora Fendalton School to P3 parking restrictions during pick-up and drop-off times on school days only.

3.2       Currently, P1 parking restrictions are in place from 8:30am – 9:30am and 2:30pm – 3:30pm on school days only.

3.3       The recommended option is to install P3 restrictions in accordance with Attachment A.

3.4       This report recommends adjusting parking restrictions to more practical timeframes, improving ease of use and enforcement of Council on-street parking facilities.

4.   Background/Context Te Horopaki

4.1       P1 parking restrictions are currently in place on Clyde Road adjacent to Tūora Fendalton School.

4.2       In some cases, including on Clyde Road outside of Tūora Fendalton School, P1 parking restrictions have been found to be impractical for users and enforcement.

4.3       This report is part of ongoing work to convert some existing P1 parking restrictions near schools to P3 parking restrictions.

4.4       Approval is required by the Waimāero Fendalton-Waimairi-Harewood Community Board.

4.5       If approved, the recommendations will be implemented within the current financial year (generally around four weeks after the contractor receives the request, but this is subject to other factors such as resourcing and prioritisation beyond Council’s control).

 

Options Considered Ngā Kōwhiringa Whaiwhakaaro

4.6       The following reasonably practicable options were considered and are assessed in this report:

4.6.1         Convert existing P1 parking restrictions on Clyde Road adjacent to Tūora Fendalton School to P3 parking restrictions during pick-up and drop-off times on school days only.

4.6.2         Maintain the status quo.

Options Descriptions Ngā Kōwhiringa

4.7    Preferred Option: Convert existing P1 parking restrictions on Clyde Road adjacent to Tūora Fendalton School to P3 parking restrictions.

4.7.1         Option Advantages

·     Enable a more practical timeframe for caregivers to drop-off and pick-up students.

·     Enables greater practicality of enforcement for the Council.

4.7.2   Option Disadvantages

·     Does not align with the preference of the school for status quo.

·     With sufficient compliance, P3 parking restrictions may reduce turnover and increase the difficulty of caregivers picking-up and dropping-off students.

4.8       Option 2: Maintain the status quo.

4.8.1   Option Advantages

·     Aligns with the preference of Tūora Fendalton School.

·     No physical sign and/or road marking changes required.

4.8.2   Option Disadvantages

·     Maintains parking restrictions that may be unpractical and difficult to enforce.

·     Poor compliance will persist, which does not address this issue raised by Tūora Fendalton School.

 

5.   Financial Implications Ngā Hīraunga Rauemi

Capex/Opex Ngā Utu Whakahaere

 

Recommended Option

Option 2 – Do nothing

Cost to Investigate

$750 to write report in including consultation and site visits

$750 to write report in including consultation and site visits

Cost to Implement

$400 to install signs and road markings

n/a

Maintenance/Ongoing Costs

Covered by the existing maintenance contract

Covered by the existing maintenance contract

Funding Source

Traffic Operations Team traffic signs and markings budget

n/a

 

6.   Considerations Ngā Whai Whakaaro

Risks and Mitigations Ngā Mōrearea me ngā Whakamātautau

6.1       None identified.

Legal Considerations Ngā Hīraunga ā-Ture

6.2       Statutory and/or delegated authority to undertake proposals in the report:

6.2.1   Part 1, Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017 provides Council with the authority to install parking or stopping restrictions by resolution.

6.2.2   The Community Boards have delegated authority from the Council to exercise the delegations as set out in the Delegations Register. The list of delegations for the Community Boards includes the resolution of stopping and traffic control devices.

6.2.3   The installation of any signs and/or markings associated with traffic control devices must comply with the Land Transport Rule: Traffic Control Devices 2004.

6.3      Other Legal Implications:

6.3.1   There is no other legal context, issue, or implication relevant to this decision.

6.3.2   This specific report has not been reviewed and approved by the Legal Services Unit however the report has been written using a general approach previously approved of by the Legal Services Unit, and the recommendations are consistent with the policy and legislative framework outlined in this report.

Strategy and Policy Considerations Te Whai Kaupapa here

6.4       The required decisions:

6.4.1   Aligns with the Christchurch City Council’s Strategic Framework.

6.4.2   The recommendations in this report are consistent with the Christchurch Suburban Parking Policy.

6.4.3   The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy. The level of significance was determined by the low level of impact and low number of people affected by the recommended decision.

6.5       The community engagement and consultation outlined in this report reflect the assessment.

6.6       This report supports the Council's Long Term Plan (2024 - 2034):

6.7       Transport

6.7.1   Activity: Transport

·   Level of Service: 10.3.3 Maintain customer satisfaction with the ease of use of Council on-street parking facilities - >=50%  

Community Impacts and Views Ngā Mariu ā-Hāpori

6.8       Tūora Fendalton School was consulted. The school prefers to maintain P1 parking restrictions as it encourages high turnover, however, compliance was raised as an existing issue.

6.9       The Team Leader Parking Compliance supports the preferred option.

6.10    The decision affects the following wards/Community Board areas:

6.10.1   Fendalton Ward.

Impact on Mana Whenua Ngā Whai Take Mana Whenua

6.11    The decision does not involve a significant decision concerning ancestral land or a body of water or other elements of intrinsic value, therefore this decision does not specifically impact Mana Whenua, their culture and traditions.

6.12    The decision does not involve a matter of interest to Mana Whenua and will not impact on our agreed partnership priorities with Ngā Papatipu Rūnanga.

Climate Change Impact Considerations Ngā Whai Whakaaro mā te Āhuarangi

6.13    The proposals in this report are unlikely to contribute significantly to adaptation to the impacts of climate change or emissions reductions.

6.14    This is a minor proposal that is principally intended to address parking space availability in this location. Due to the minor nature of the works, it is not intended to have any impact on climate change.

7.   Next Steps Ngā Mahinga ā-muri

7.1       If approved, staff will arrange for new signs and road markings to be installed.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Attachment A - Clyde Road Proposed Parking Improvements For Consultation

25/1986301

74

 

 

In addition to the attached documents, the following background information is available:

Document Name – Location / File Link

Not applicable

 

 

 

Signatories Ngā Kaiwaitohu

Authors

Jack Halliday - Travel Planning Assistant

Ashley Beaton - Community Travel Adviser

Approved By

Sarah Anderson - Team Leader Travel Demand Management

Kathy Graham - Team Leader Traffic Operations

Stephen Wright - Manager Operations (Transport)

 

 



ele

 

14.   Proposed P120 Parking Restrictions - Staveley Street

Reference Te Tohutoro:

25/2367114

Responsible Officer(s) Te Pou Matua:

Gautham Praburam, Traffic Engineer

Accountable ELT Member Pouwhakarae:

Brent Smith, General Manager City Infrastructure

  

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is to seek the approval of the Waimāero Fendalton-Waimairi-Harewood Community Board to apply time restrictions to the angled parking spaces fronting 104 Staveley Street.

1.2       This report has been written after receiving feedback from one of the owners of the business at 104 Staveley Street, who raised concerns about a potential increase in on-street parking demand following the completion of a nearby residential development.

1.3       The recommended option is to apply P120 parking restrictions to 13 of the 14 existing angled parking spaces outside 104 Staveley Street as shown in Attachment A.

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Proposed P120 Parking Restrictions - Staveley Street Report.

2.         Notes that the decision in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Under Clause 6(2) of the Christchurch City Council Traffic and Parking Bylaw 2017 revokes any previous resolutions pertaining to traffic controls made pursuant to any bylaw to the extent that they are in conflict with the parking or stopping restrictions described in resolutions 0 and 0 below.

4.         Approves that, in accordance with Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017, a bicycle parking area is resolved on the northern side of Staveley Street, commencing at a point 62 metres east of its intersection with Withells Road and extending in an easterly direction for a distance of three metres as detailed in Attachment A (TG151651, Issue 1, dated 25/11/2025).

5.         Approves that, in accordance with Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017, the parking of vehicles be restricted to a maximum period of 120 minutes, and be further restricted by way of 60 degree angle parking, on the northern side of Staveley Street, commencing at a point 67 metres east of its intersection with Withells Road and extending in an easterly direction for a distance of 39 metres as detailed in Attachment A (TG151651, Issue 1, dated 25/11/2025).

6.         Approves that these resolutions take effect when parking signage and/or road markings that evidence the restrictions described in this staff report are in place (or removed in the case of revocations).

 

3.   Executive Summary Te Whakarāpopoto Matua

3.1       Multiple shops and businesses are currently operating at 104 Staveley Street, generating ongoing demand for convenient customer parking.

3.2       Customers previously relied on the private section at 100 Staveley Street for parking. However, this area is now being redeveloped into a residential facility and will no longer be available for public use.

3.3       With this off-street parking option removed, customers are expected to rely more heavily on the on-street parking spaces nearby.

3.4       These nearby on-street parking spaces may also be occupied for extended periods by future residents of the new development at 100 Staveley Street, further reducing the availability of short-stay parking for business customers.

3.5       The recommended option is to apply P120 parking restrictions to 13 of the 14 existing angled parking spaces outside 104 Staveley Street and reserving the space immediately west of the angled parking spaces for bicycle parking as shown in Attachment A.

3.6       The recommendations in this report will help increase parking turnover, thereby better supporting the needs of the local businesses and their customers.

4.   Background/Context Te Horopaki

4.1       Staveley Street is located in the Avonhead suburb of Christchurch. 100 Staveley Street and 104 Staveley Street are situated near the western end of the street, close to its intersection with Withells Road, and are approximately 1.6 km from the University of Canterbury’s Dovedale Campus.

4.2       Multiple shops and small businesses operate from the commercial units at 104 Staveley Street. These activities generate a consistent demand for short stay parking close to the premises, as customers typically require convenient access for quick visits, purchases, or appointments.

4.3       Historically, customers of these businesses made use of the vacant section at 100 Staveley Street for parking. This off-street area provided additional capacity and helped absorb peak-time demand, reducing pressure on the on-street parking spaces nearby.

4.4       The section at 100 Staveley Street is now being redeveloped into a residential facility. As a result, the informal parking previously available to customers is longer accessible to the public.

4.5       With the removal of this off-street parking opportunity, customers now rely on the surrounding on-street parking spaces.

4.6       Future residents of the new development at 100 Staveley Street may also utilise these same on-street spaces, often for longer durations. This may further reduce the availability of convenient short-stay parking for customers visiting the businesses at 104 Staveley Street.

4.7       Given the importance of maintaining accessible short-stay parking to support these local businesses, it is appropriate to review the existing parking arrangements and consider measures that improve turnover and maintain parking availability for customers.

4.8       The recommended option is to introduce P120 parking restrictions to 13 of the 14 existing angled parking spaces outside 104 Staveley Street, as shown in Attachment A.

4.9       The remaining space at the western end contains a fire hydrant and may only be legally used when a driver stays with the vehicle. Applying a time restriction to this space would be inconsistent with the parking rules that apply to vehicles when parking over fire hydrants.

4.10    The recommended option also includes reserving the space immediately west of the angled parking spaces for bicycle parking.

Options Considered Ngā Kōwhiringa Whaiwhakaaro

4.11    The following reasonably practicable options were considered and are assessed in this report:

4.11.1 Apply P120 parking restrictions to 13 of the 14 existing angled parking spaces outside 104 Staveley Street and formalise bicycle parking at the western end.

4.11.2 Do Nothing.

Options Descriptions Ngā Kōwhiringa

4.12    Preferred Option: Apply P120 parking restrictions to 13 of the 14 existing angled parking spaces outside 104 Staveley Street and formalise bicycle parking at the western end.

4.12.1 Option Description: Vehicles can park for a maximum of 120 minutes in 13 of the 14 existing on-street angled parking spaces outside 104 Staveley Street. This restriction will apply between the hours of 8am and 6pm on all days other than public holidays.

A fire hydrant is located in the westernmost parking space, which may only be used when a driver remains with the vehicle. Introducing a time-restriction for this space would conflict with the existing legal requirements governing parking over fire hydrants.

4.12.2 Option Advantages

·     Helps prevent all day parking and increases turnover, thereby improving the availability of convenient short-stay spaces in close proximity for customers visiting the businesses at 104 Staveley Street.

4.12.3 Option Disadvantages

·     Reduces the number of unrestricted on-street parking spaces.

4.13    Option 2: Do Nothing

4.13.1 Option Description: Do Nothing

4.13.2 Option Advantages

·     Unrestricted on-street parking would be available in this part of Staveley Street.

4.13.3 Option Disadvantages

·     Could encourage all-day parking, thereby reducing turnover and limiting the availability of convenient short-stay spaces in close proximity for customers visiting the businesses at 104 Staveley Street.

5.   Financial Implications Ngā Hīraunga Rauemi

Capex/Opex Ngā Utu Whakahaere

 

Recommended Option

Option 2 - Do Nothing

Cost to prepare report

(Traffic Operations staff budget)

$750

$750

Cost to Implement

$1200

$0

Maintenance/Ongoing Costs

Covered by the existing

maintenance contract

$0

Funding Source

Traffic Operations - Road Markings and Signs budget

$0

6.   Considerations Ngā Whai Whakaaro

Risks and Mitigations Ngā Mōrearea me ngā Whakamātautau

6.1       None identified.

Legal Considerations Ngā Hīraunga ā-Ture

6.2       Statutory and/or delegated authority to undertake proposals in the report:

6.2.1   Part 1, Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017 provides Council with the authority to install parking or stopping restrictions by resolution.

6.2.2   Clause 6(2) of the Christchurch City Council Traffic and Parking Bylaw 2017 provides Council with the authority to subsequently amend or revoke any resolution made under this bylaw at any time.

6.2.3   The Community Boards have delegated authority from the Council to exercise the delegations as set out in the Delegations Register. The list of delegations for the Community Boards includes the resolution of stopping and traffic control devices.

6.2.4   The installation of any signs and/or markings associated with traffic control devices must comply with the Land Transport Rule: Traffic Control Devices 2004.

6.3      Other Legal Implications:

6.3.1   There is no other legal context, issue, or implication relevant to this decision.

6.3.2   This specific report has not been reviewed and approved by the Legal Services Unit however the report has been written using a general approach previously approved of by the Legal Services Unit, and the recommendations are consistent with the policy and legislative framework outlined in this report.

Strategy and Policy Considerations Te Whai Kaupapa here

6.4       The required decision:

6.4.1   Aligns with the Christchurch City Council’s Strategic Framework.

6.4.2   The recommendations in this report are consistent with the Christchurch Suburban Parking Policy.

6.4.3   The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy. The level of significance was determined by the low level of impact and low number of people affected by the recommended decision.

6.5       The community engagement and consultation outlined in this report reflect the assessment.

6.6       This report supports the Council's Long Term Plan (2024 - 2034):

6.7       Transport

6.7.1   Activity: Transport

·   Level of Service: 10.3.3 Maintain customer satisfaction with the ease of use of Council on-street parking facilities - >=50%  

Community Impacts and Views Ngā Mariu ā-Hāpori

6.8       Prior to formal consultation, staff attempted to gather early feedback from the business owners at 104 Staveley Street. One business owner agreed to discuss the proposed parking restrictions with the other businesses. They advised that there was general support for a P120 limit. While one of the business owners initially preferred a shorter restriction (5 minutes), they ultimately agreed that P120 was the most suitable option. Other shops / businesses were also supportive once they understood the potential impact of long-term parking from the new development.

6.9       Following this, a letter summarising the proposal, along with a plan was sent to the affected property owners, business owners and residents.

6.10    Six submissions were received during the formal consultation period.

6.11    Three submitters expressed support for the proposal. In addition to their support, they also provided the following feedback and requests:

6.11.1 Submitters requested that P120 parking restrictions also be applied to the on-street spaces outside 101 Staveley Street. They noted that the three residential units at this address are designated for occupants aged over 60 or for people with disabilities, and that carers regularly visit the site. Convenient short-stay parking in close proximity was therefore preferred. Submitters also expressed concern that, due to 101 Staveley Street being located directly opposite the new residential development, these spaces may otherwise be occupied for longer periods—potentially by new residents—reducing the availability of suitable parking for carers.

6.11.2 That one of the existing on-street angled parking spaces be designated as a mobility car park to provide better access for users with mobility challenges.

6.12    Staff consider it appropriate to first monitor the effects of the proposed P120 restrictions before introducing any additional measures. Introducing further controls at this stage, including mobility parking, may potentially result in over-restricting the area and unnecessarily limiting parking flexibility for users. Once the initial restrictions are in place, staff can review their impact and, if parking pressures continue or new issues arise, further changes can be investigated if required.

6.13    Three submitters opposed the proposal:

6.13.1 One of them felt that time-restricted parking was unnecessary in this location, noting that in their experience vehicles typically do not stay in the angled parking spaces for more than 20 minutes. They were concerned that introducing time limits could set a precedent for other locations and saw the proposal as unnecessary and overly restrictive.

6.13.2 Two other residents who opposed the proposed P120 restriction expressed concern that the new development will result in additional vehicles parking on-street, leading to significant congestion in the surrounding area. They felt that the proposed P120 restriction would negatively affect nearby businesses—many of which rely on short visits and operate beyond 6pm—and would also not sufficiently support residents’ parking needs.

As an alternative, they suggested applying a P30 restriction (8am–8:30pm) to the eight angled spaces closest to Withells Road to support business turnover, while leaving the remaining angled spaces unrestricted to provide longer-stay parking for residents. They also requested improved enforcement options for illegal parking occurring outside standard enforcement hours.

6.14    The area immediately west of the angled parking spaces has been setup to function as a bicycle parking zone. However, no clear signage or pavement markings are currently present to indicate this intended use. Following consultation, an internal review identified the need to formally designate this space for bicycle parking and to install appropriate signage.

The plan sent out for consultation did not indicate any signage for bicycle parking. Given the current layout, the space is unlikely to be suitable for any purpose other than bicycle parking. As this change simply formalises the intended use and represents a minor modification, staff considered that re-consultation was not required.

6.15    The consultation plan included a P120 time-limit sign at both the start and end of the proposed restriction, along with a repeater P120 sign located between them. During an internal review, staff determined that the repeater sign was unnecessary, based on Waka Kotahi NZTA guidelines and the existing road environment. As a result, the repeater sign has been removed from the final plan.

6.16    The Team Leader Parking Compliance supports the preferred option.

6.17    There is ongoing communication with one of the adjacent business owners regarding vehicles using the pedestrian area east of the shops. This is a separate matter, and investigations are currently in progress to determine an appropriate way forward. It does not affect the current proposal, which only applies time restrictions to the angled parking spaces at this location.

6.18    The decision affects the following wards/Community Board areas:

6.18.1 Waimāero Fendalton-Waimairi-Harewood Community Board.

Impact on Mana Whenua Ngā Whai Take Mana Whenua

6.19    The decision does not involve a significant decision concerning ancestral land or a body of water or other elements of intrinsic value, therefore this decision does not specifically impact Mana Whenua, their culture and traditions.

6.20    The decision does not involve a matter of interest to Mana Whenua and will not impact on our agreed partnership priorities with Ngā Papatipu Rūnanga.

Climate Change Impact Considerations Ngā Whai Whakaaro mā te Āhuarangi

6.16    The proposal in this report is unlikely to contribute significantly to adaptation to the impacts of climate change or emissions reductions.

6.17    This is a minor proposal that is primarily aimed at addressing concerns related to on-street parking demand at this location. Due to the minor nature of the works, it is not expected to have any impact on climate change.

7.   Next Steps Ngā Mahinga ā-muri

7.1       If approved, the recommendations will be implemented within the current financial year (generally around four weeks after the contractor receives the request, but this is subject to other factors such as resourcing and prioritisation beyond Council’s control).

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Staveley Street - Proposed P120 Parking Restrictions

25/2399684

82

b

Consultation Responses - Staveley Street Parking Restrictions

25/2442476

83

 

 

In addition to the attached documents, the following background information is available:

Document Name – Location / File Link

Not applicable

 

 

 

 

Signatories Ngā Kaiwaitohu

Author

Gautham Praburam - Traffic Engineer

Approved By

Kathy Graham - Team Leader Traffic Operations

Stephen Wright - Manager Operations (Transport)

 

 



A close-up of a document

AI-generated content may be incorrect.

A screenshot of a email

AI-generated content may be incorrect.

A paper with text on it

AI-generated content may be incorrect.

A document with text on it

AI-generated content may be incorrect.

A document with text and a list of time

AI-generated content may be incorrect.

A letter to a person

AI-generated content may be incorrect.


15.   Waimāero Fendalton-Waimairi-Harewood - Better-Off Fund Applications for Consideration - Anglican Diocese of Christchurch - Parish of Merivale St Albans; Riccarton Sports Hub Trust

Reference Te Tohutoro:

25/1999216

Responsible Officer(s) Te Pou Matua:

Natalie Dally, Community Development Advisor
Lisa Gregory, Community Recreation Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waimāero Fendalton-Waimairi-Harewood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

FWH_00001_BOF

Anglican Diocese of Christchurch - Parish of Merivale St Albans

Community Van

$38,000

$38,000

FWH_00002_BOF

Riccarton Sports Hub Trust

Technical Services

$41,689

$12,000

 

1.2       There is currently a balance of $50,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Waimāero Fendalton-Waimairi-Harewood - Better-Off Fund Applications for Consideration - Anglican Diocese of Christchurch - Parish of Merivale St Albans; Riccarton Sports Hub Trust Report.

2.         Notes that the decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $38,000 from its Better-Off Fund to the Anglican Diocese of Christchurch - Parish of Merivale St Albans towards the purchase of a community van for use by groups in the Waimāero Fendalton-Waimairi-Harewood Community Board area.

4.         Approves a grant of $12,000 from its Better-Off Fund to the Riccarton Sports Hub Trust towards expenses towards technical services required for the facility upgrade at the Upper Riccarton Domain.

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$450,000

$50,000

$0

 

 

3.12    Based on the current Better-Off Fund criteria, the above applications are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Fund Project Brief - Anglican Diocese of Christchurch - Parish of Merivale St Albans

25/2383024

92

b

Better Off Fund Project Brief - Riccarton Sports Hub Trust

25/2383807

95

 

 

Signatories Ngā Kaiwaitohu

Authors

Natalie Dally - Community Development Advisor

Lisa Gregory - Community Recreation Advisor

Approved By

Maryanne Lomax - Manager Community Governance, Fendalton-Waimairi-Harewood

John Filsell - Head of Community Support and Partnerships

 

 


A close-up of a project

AI-generated content may be incorrect.

A document with text and a note

AI-generated content may be incorrect.

A screenshot of a computer

AI-generated content may be incorrect.


A project plan with text and images

AI-generated content may be incorrect.

A document with text and images

AI-generated content may be incorrect.

A screenshot of a computer

AI-generated content may be incorrect.


16.   Fendalton-Waimairi-Harewood 2025-2026 Discretionary Response Fund Applications - Burnside Squash Rackets Club Incorporated, St Margaret's Church, Yaldhurst School, Anglican Diocese of Christchurch Parish of Burnside Harewood, Kiribati Federation Aotearoa Incorporated

Reference Te Tohutoro:

25/2000568

Responsible Officer(s) Te Pou Matua:

Lisa Gregory, Community Recreation Advisor
Natalie Dally, Community Development Advisor
Karen Boag, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waimāero Fendalton-Waimairi-Harewood Community Board to consider applications for funding from its 2025-26 Discretionary Response Fund from the organisations listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

DRF25/26_00015

Burnside Squash Rackets Club Incorporated

Squash Court Flooring

$14,900

$12,000

DRF25/26_00012

St Margaret's Presbyterian Church (Bishopdale)

New Heat Pumps for Community Hall

$13,648

$5,000

DRF25/26_00018

Yaldhurst School Tōtara Tūkaha

Community Access to School Pool for Summer

$4,526

$4,526

DRF25/26_00021

Anglican Diocese of Christchurch Parish of Burnside Harewood

Kia Ora Burnside - Connect@Kendal

$2,990

$2,900

DRF25/26_00020

Kiribati Federation Aotearoa Incorporated

Saturday Night Sport

$2,000

$1,500

 

1.2       There is currently a balance of $120,010 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the report:  Fendalton-Waimairi-Harewood 2025-2026 Discretionary Response Fund Applications - Burnside Squash Rackets Club Incorporated, St Margaret's Church, Yaldhurst School, Anglican Diocese of Christchurch Parish of Burnside Harewood, Kiribati Federation Aotearoa Incorporated.

2.         Notes that the decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $12,000 from its 2025/26 Discretionary Response Fund to Burnside Squash Rackets Club Incorporated towards replacement of their squash court flooring.

4.         Approves a grant of $5,000 from its 2025/26 Discretionary Response Fund to St Margaret's Presbyterian Church (Bishopdale) towards the purchase and installation of heat pumps for the community hall.

5.         Approves a grant of $4,526 from its 2025/26 Discretionary Response Fund to Yaldhurst School Tōtara Tūkaha towards costs associated with the installation of a swipe card system for the pool to allow safe community access.

6.         Approves a grant of $2,900 from its 2025/26 Discretionary Response Fund to the Anglican Diocese of Christchurch Parish of Burnside Harewood towards Kia Ora Burnside -Connect@Kendal.

7.         Approves a grant of $1,500 from its 2025/26 Discretionary Response Fund to Kiribati Federation Aotearoa Incorporated towards the Saturday Night Sport Project.

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned with the Council's Strategic Framework and in particular the strategic priorities of the Strengthening Communities Together Strategy and the Physical Recreation and Sport Strategy.

Decision Making Authority Te Mana Whakatau

3.2       The Community Board has the delegated authority to determine the allocation of the Discretionary Response Fund for each community.

3.2.1   Allocations must be consistent with any Council-adopted policies, standards or criteria.

3.2.2   The Fund does not cover:

·     Legal or environmental court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.3       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.4       The significance level was determined by the number of people affected and/or with an interest.

3.5       Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.6       At the time of writing, the balance of the 2025-26 Discretionary Response Fund is:

Total Budget Current Year

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$165,508

$45,498

$120,010

$94,084

 

3.7       Based on the current Discretionary Response Fund criteria, the applications above are eligible for funding.

3.8       The attached decision matrices provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Fendalton-Waimairi-Harewood DRF Decision Matrix - Burnside Squash Club

25/2272397

102

b

Fendalton-Waimairi-Harewood DRF Decision Matrix - St Margaret's Church

25/2377701

103

c

Fendalton-Waimairi-Harewood DRF Decision Matrix - Yaldhurst School

25/2395305

104

d

Fendalton-Waimairi-Harewood DRF Decision Matrix -  Anglican Diocese of Christchurch Parish of Burnside Harewood

25/2395166

105

e

Fendalton-Waimairi-Harewood DRF Decision Matrix - Kiribati Federation Aotearoa Incorporated

25/2395178

106

 

 

Signatories Ngā Kaiwaitohu

Authors

Natalie Dally - Community Development Advisor

Lisa Gregory - Community Recreation Advisor

Karen Boag - Community Development Advisor

Approved By

Maryanne Lomax - Manager Community Governance, Fendalton-Waimairi-Harewood

 

 


A close-up of a document

AI-generated content may be incorrect.


A screenshot of a computer

AI-generated content may be incorrect.


A close-up of a document

AI-generated content may be incorrect.


A screenshot of a document

AI-generated content may be incorrect.


A screenshot of a computer

AI-generated content may be incorrect.


17.   Governance Matters

Reference Te Tohutoro:

25/2232606

Responsible Officer(s) Te Pou Matua:

Aidan Kimberley, Community Board Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waimāero Fendalton-Waimairi-Harewood Community Board to consider:

1.1.1   Confirming the Board’s ordinary formal and informal meeting schedule for the term.

1.1.2   Establishing a Recess Committee with delegated authority to on behalf of the Community Board during the period between the Board’s final meeting of each calendar year up until its next scheduled meeting the following year.

1.1.3   Establishing a Submissions Committee.

1.1.4   Appointing Board representatives on local external organisations.

1.2       This report is staff generated to enable the Board to consider the adoption of its governance arrangements for the duration of the 2025-28 electoral term.

1.3       The Board can review these arrangements at any time during the term should it wish to do so.

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Governance Matters Report.

2.         Notes that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

 

3.         Adopts the following schedule of Ordinary Meetings in for the 2025-28 term:

Date

Time

Location

16 February 2026

4.30 pm

Boardroom, Fendalton Library and Service Centre

16 March 2026

4.30 pm

Boardroom, Fendalton Library and Service Centre

20 April 2026

4.30 pm

Boardroom, Fendalton Library and Service Centre

18 May 2026

4.30 pm

Boardroom, Fendalton Library and Service Centre

22 June 2026

4.30 pm

Boardroom, Fendalton Library and Service Centre

20 July 2026

4.30 pm

Boardroom, Fendalton Library and Service Centre

17 August 2026

4.30 pm

Boardroom, Fendalton Library and Service Centre

21 September 2026

4.30 pm

Boardroom, Fendalton Library and Service Centre

19 October 2026

4.30 pm

Boardroom, Fendalton Library and Service Centre

16 November 2026

4.30 pm

Boardroom, Fendalton Library and Service Centre

7 December 2026

4.30 pm

Boardroom, Fendalton Library and Service Centre

15 February 2027

4.30 pm

Boardroom, Fendalton Library and Service Centre

15 March 2027

4.30 pm

Boardroom, Fendalton Library and Service Centre

19 April 2027

4.30 pm

Boardroom, Fendalton Library and Service Centre

17 May 2027

4.30 pm

Boardroom, Fendalton Library and Service Centre

21 June 2027

4.30 pm

Boardroom, Fendalton Library and Service Centre

19 July 2027

4.30 pm

Boardroom, Fendalton Library and Service Centre

16 August 2027

4.30 pm

Boardroom, Fendalton Library and Service Centre

20 September 2027

4.30 pm

Boardroom, Fendalton Library and Service Centre

18 October 2027

4.30 pm

Boardroom, Fendalton Library and Service Centre

15 November 2027

4.30 pm

Boardroom, Fendalton Library and Service Centre

6 December 2027

4.30 pm

Boardroom, Fendalton Library and Service Centre

21 February 2028

4.30 pm

Boardroom, Fendalton Library and Service Centre

20 March 2028

4.30 pm

Boardroom, Fendalton Library and Service Centre

18 April 2028

4.30 pm

Boardroom, Fendalton Library and Service Centre

15 May 2028

4.30 pm

Boardroom, Fendalton Library and Service Centre

19 June 2028

4.30 pm

Boardroom, Fendalton Library and Service Centre

17 July 2028

4.30 pm

Boardroom, Fendalton Library and Service Centre

21 August 2028

4.30 pm

Boardroom, Fendalton Library and Service Centre

18 September 2028

4.30 pm

Boardroom, Fendalton Library and Service Centre

 

4.         Authorises the Community Governance Manager, in consultation with the Community Board Chairperson, to amend the meeting schedule as required including adding or removing ordinary meetings.

5.         Agrees that Board Information Sharing Sessions/Workshops will take place on an as-required basis, typically on the first Monday of each month or following ordinary Board meetings.

6.         Agrees to hold meetings with local School Principals twice a year, with the schedule to be confirmed by the Community Governance Manager.

7.         Establishes a  Waimāero Fendalton-Waimairi-Harewood Community Board Submissions Committee for the duration of the 2025-28 electoral term as follows:

a.         Term of Reference being to respond to submission opportunities on behalf of the Waimāero Fendalton-Waimairi-Harewood Community Board as they arise.

b.         James Gough, Lucy Keown, Nicola McCormick, Jason Middlemiss, Ben Spittle and Bridget Williams are appointed as members of the Submissions Committee.

c.         <Enter Name> is appointed Committee Chairperson and <Enter Name> is appointed Deputy Chairperson of the Submissions Committee.

d.         The quorum of the Submissions Committee is three members.

e.         The Submissions Committee is granted delegated authority to lodge submissions on behalf of the Waimāero Fendalton-Waimairi-Harewood Community Board.

f.          Any submissions made by the Submissions Committee will be reported to the Waimāero Fendalton-Waimairi-Harewood Community Board for record keeping purposes.

g.         The Community Governance Manager and Submissions Committee Chairperson are authorised to convene meetings of the Submissions Committee.

h.         The Chairperson of the Submissions Committee, in consultation with the remaining Committee members, is delegated the authority to make submissions on behalf of the Community Board without calling a Submissions Committee meeting when responding to minor, uncontroversial submission opportunities. If the Committee Chairperson is unavailable, this delegation may be exercised by the Community Board Chairperson.

8.         Appoints a Recess Committee, with all Fendalton-Waimairi-Harewood Community Board members being members of the Committee, with a quorum of two. The Community Board Chairperson and Deputy Chairperson will also be Chairperson and Deputy Chairperson of the Recess Committee, except if neither is available the Committee will elect a Chairperson for that meeting.

9.         Authorises the Recess Committee to exercise the delegated powers of the Waimāero Fendalton-Waimairi-Harewood Community Board for the period between its final ordinary meeting of each calendar year up until the date of the Board’s first ordinary meeting the following calendar year, to enable decision-making over any urgent business that is unable to wait until ordinary meetings commence.  

10.       Notes that any such delegation exercised by the Board’s Recess Committee will be reported to the Board for record purposes.

11.       Notes that any meeting convened of the Recess Committee will be publicly notified and the details forwarded to all Board members.

12.       Appoints [Name] as the Board’s representative to the Riccarton Bush Trust.

13.       Appoints [Name] as the Board’s representative to the Airport Noise Liaison Committee.

14.       Appoints up to two members as the Board’s representatives to the Keep Christchurch Beautiful Committee.

15.       Appoints [Name] as the Board’s representative to the McLean Institute.

16.       Appoints [Name] as the Board’s representative on the Waimakariri-Eyre-Cust River Rating District Liaison Committee.

3.   Background/Context Te Horopaki

3.1       The staff recommendation is that Board meetings be held at 4.30pm on the third Monday of each calendar month (excluding January), but earlier in December to avoid meeting on the week of Christmas. Exceptions are made where necessary to avoid public holidays.  In addition to the decision-making Board meetings, allowance will be made for information sharing sessions/workshops on the first Monday of the month or at the end of ordinary Board meetings. These will only occur on an as-required basis. These sessions provide an opportunity for Board members to receive information and have an informal discussion on issues where no decision is required at the time.

3.2       It has been the Board’s practice to establish a Board Recess Committee, comprising at least two Board members, with authority to make any needed decision(s) on the Board’s behalf over the Christmas/New Year period. This would only be exercised in the case of urgent business which cannot wait until ordinary meetings commence for the year. During the 2022-25 term the Recess Committee did not need to meet, but it is a helpful option if any urgent matters arise.

3.3       The Community Board’s regular practice for managing submissions is to appoint a Submissions Committee. Because the majority of submissions are on Council projects, it would be inappropriate for Councillors to participate in forming submissions as this would create a perception of pretermination and bias when voting on the matter at the Council table. Establishing a separate Submissions Committee that does not involve Councillors mitigates this risk.

3.4       Each triennium, Community Boards routinely appoint members to various local organisations. This important liaison role enables two-way contact and information sharing between the Board member(s) appointed and community organisations on behalf of the Board. In some cases the appointment is also required by an Act of Parliament, Trust Deed, or decision of Council.

4.   Context / Background / Te Horopaki

4.1       The decisions in this report are of low significance concerning the Christchurch City Council’s Significance and Engagement Policy. 

 

4.2       Clause 30, Schedule 7 of the Local Government Act 2002 inter alia, provides that community boards may appoint committees, subcommittees or other subordinate decision-making bodies and joint committees considered appropriate. Also, clause 32(3) of the same schedule provides for community boards to delegate powers to a committee.

4.1       For its 2022-25 Term, the Waimāero Fendalton-Waimairi-Harewood Community Board made the following appointments:

Organisation

Member(s) Appointed

Riccarton Bush Trust

Shirish Paranjape

Airport Noise Liaison Committee

Nicola McCormick and Linda Chen

Keep Christchurch Beautiful Committee

Bridget Williams and David Cartwright

McLean Institute

David Cartwright

Waimakariri-Eyre-Cust River Rating District Liaison Committee

Jason Middlemiss

 

4.2       A brief summary of the organisations is as follows:

Organisation

Reason for Appointing

Description

Riccarton Bush Trust

The Trust is governed by an Act of Parliament requiring the Council to appoint various members to the Trust. The Council has delegated one of those appointments to this Community Board.

The Riccarton Bush Trust exists to protect and promote Riccarton Bush, Riccarton House, Deans Cottage and their grounds.

Airport Noise Liaison Committee

The Christchurch District Plan requires Christchurch International Airport Ltd to establish an Airport Noise Liaison Committee, with the membership including two Community Board members.

The role of the Committee is to:

·    Consider and make recommendations to the airport on community concerns related to aircraft operations and engine testing

·    Liaise with the community on relevant noise matters

·    Assist with the review of the Airport Noise Management Plan, Acoustic Treatment Programme, and noise complaint procedures.

Keep Christchurch Beautiful Committee

The Keep Christchurch Beautiful Society’s constitution provides for at least one member representing each Community Board. The Society has indicated a preference for each Board to appoint two members.

Keep Christchurch Beautiful aims to promote a cleaner, more beautiful environment for Christchurch City. The organisation supports a range of initiatives including education programmes, attending community events and organising community clean up days.

McLean Institute

The Institute is governed by an Act of Parliament which stipulates that the Mayor of Christchurch shall be a trustee, but may nominate another person to act in his place.

In practice, the Council has authorised this Community Board to make that appointment.

The Institute exists to provide assistance to, and promote the welfare of, disadvantaged women. The Institute holds various investments stemming from the estate of Allan McLean who left an endowment in his will.

The Institute founded the Holly Lea retirement village in Fendalton. Although the Institute has since divested its ownership of the village, the historic connection with this area is why the Council wanted a member from the local Community Board to be appointed as a Trustee.

Waimakariri-Eyre-Cust River Rating District Liaison Committee

The Committee is established by Environment Canterbury, who have requested the appointment of a Community Board Member.

The River Rating District Laision Committees exist to provide a direct line of communication between local communities and the Regional Council on matters relating to river control works and flood protection.

 

 

 

Attachments Ngā Tāpirihanga

There are no attachments to this report.

 

In addition to the attached documents, the following background information is available:

Document Name – Location / File Link

Not applicable

 

 

 

 

Signatories Ngā Kaiwaitohu

Author

Aidan Kimberley - Community Board Advisor

Approved By

Maryanne Lomax - Manager Community Governance, Fendalton-Waimairi-Harewood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


18.   Waimāero Fendalton-Waimairi-Harewood Community Board Area Report - December 2025

Reference Te Tohutoro:

25/2385143

Responsible Officer(s) Te Pou Matua:

Maryanne Lomax, Community Governance Manager, maryanne.lomax@ccc.govt.nz

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, General Manager Citizens and Community

 

 

1.   Purpose of Origin of the Report Te Pūtake Pūrongo

1.1       This report provides the Board with an overview of initiatives and issues current within the Community Board area.

1.2       This report is staff-generated monthly.

2.   Officer Recommendations Ngā Tūtohu

That the Waimāero Fendalton-Waimairi-Harewood Community Board:

1.         Receives the information in the Waimāero Fendalton-Waimairi-Harewood Community Board Area Report - December 2025.

3.   Community Support, Governance and Partnership Activity

3.1       Community Governance Projects

3.1.1         Fendalton-Waimairi-Harewood Youth Hui

Facilitated by Tim Perry from Rerenga Awa - Canterbury Youth Workers Collective, the Fendalton-Waimairi-Harewood Youth Hui brought together over 20 representatives from schools, youth trusts, and community organisations, including Burnside High 24/7 Youth Workers, Christchurch City Mission, Belfast Community Network, Asian Community Transformation Trust, PYDT, Rangatahi Bryndwr Trust, St Christopher’s Church and more.

Participants highlighted the positive impact of youth workers in schools, including mentoring, wellbeing support, leadership activities, and connecting students with community opportunities. Their work helps create safe, supportive spaces where young people feel empowered, heard, and connected. However, the current ratio of youth workers to students is extremely high, making it difficult to meet students’ needs. The number of youth workers in the wider community has also declined, both due to funding challenges.

The hui celebrated local youth initiatives, such as the Breakfast Club, youth groups, and events at Sheldon Park. At the same time, it was noted that some community spaces, particularly Jellie Park and its skate bowl, are underused because young people do not feel safe. This highlights a clear need for investment in safe, welcoming and activating spaces. Key challenges discussed included mental health pressures, social media harm, exam stress, poverty, safety concerns, and limited access to activities and transport.

As part of the hui, participants contributed to exercises mapping the youth space, which helped identify gaps, overlaps, and opportunities for collaboration.

From these discussions, several opportunities and priority areas were identified:

·    Youth Worker Shortage - Advocate for more Youth Workers in schools and the community.

·    Mental Health & Wellbeing - Strengthen support through peer programmes and school initiatives.

·    Youth Engagement & Voice - Create regular input opportunities and strengthen connections with migrant youth.

·    Safety & Security - Improve lighting, traffic safety, and activation of public spaces.

·    Accessible & Inclusive Spaces - Develop safe, welcoming venues for teens and after-school “chill” spaces and explore transport solutions.

·    Life Skills & Intergenerational Connection - Support programmes that build practical skills, hobbies, and intergenerational relationships.

·    Recognition & Empowerment - Celebrate youth leadership, volunteering, and community contributions.

·    Evidence & Advocacy - Use surveys, focus groups, and youth voice to inform priorities and funding cases.

The hui closed with agreement to establish a regular annual hui. Options for ongoing collaboration include online forums, working groups, and feedback to inform future hui and initiatives. The insights gathered will guide Council collaboration and advocacy and support initiatives to ensure young people across Fendalton-Waimairi-Harewood continue to feel supported, connected, and empowered.

A group of people sitting around a table

AI-generated content may be incorrect.

Youth organisations/activities in the Board areaA map with many notes on it

AI-generated content may be incorrect.

 

 

                                        

3.1.2         Fendalton-Waimairi-Harewood Community Liaison Meeting

The October Community Liaison Meeting was held at Fendalton Library and Service Centre, with around 22 attendees representing 16 local organisations, community groups, and service providers.

Lisa Gregory, Community Recreation Advisor and our team’s event guru, shared timely insights on event planning, vendor management, and community engagement, emphasising early planning, clear task lists, and post-event evaluation as the event season approaches. She also highlighted the upcoming Kia Rite Hoea Workshop, offering practical tools, templates, and expert advice for community groups, schools, and sports clubs.

Karen Boag, Community Development Advisor, provided a summary of recent Youth Hui outcomes.

Natalie Dally, Community Development Advisor, led a session on cultural connections and inclusivity, focusing on embedding Te Tiriti o Waitangi principles and engaging diverse communities. Participants shared examples of supporting Māori, migrant, and other communities through programmes, workshops, translated resources, and inclusive practices. Training and support needs for future workshops were also identified.

Karen also facilitated discussion on priorities for 2026 Hui and workshops. Suggestions included:

·    Multicultural and ethnic community engagement

·    Practical budgeting tools and guidance on accessing support services

·    Creative solutions to service closures and reduced resources

·    Community asset mapping

·    Parenting support and resource connections

·    Youth employment and relationship support

·    Increased opportunities for older adults

Karen provided an update that the Funding Hui is planned for March 2026, and the next stage of Emergency Response work will support specific areas with local planning.

The meeting concluded with updates on upcoming activities, including foot clinics, fairs, Trunk or Treat events, active exercise classes, financial mentoring, and community seminars.

The next gathering will be the Thank You Breakfast on Thursday, 27 November 2025. Board members are warmly invited to attend and show appreciation to the groups.

 

3.1.3         Burnside Park Tennis Club Centenary Celebrations

The club began in 1925 as Fendalton Tennis Club, with 5 courts on land at 43 Burnside Road, now called Memorial Avenue. In 1976 it moved to Burnside Park where 10 courts were established and in 2006 it changed its name to Burnside Park Tennis Club to better reflect its location. 

 

Past and present members joined together on Friday30 October 2025 for a centenary dinner at the Commodore.  The evening was friendly and lively as old friendships were revived and memories shared. Speakers recounted key moments in the history of the club and its people, and pianist Anria Breytenbach entertained the guests on her keyboard.

On Saturday afternoon on-court activities were held at the club with fun tennis drills and the opportunity to try out pickleball.  Once again past and present members mingled and reminisced. David James, Club President, welcomed everyone including Mayor Phil Mauger and Councillor Sam McDonald. Brief speeches were made, the BBQ was fired up and the centenary cake was cut by Robyn Campbell (Life member) and Joe Keller (a Past President). 

It was a wonderful weekend, celebrating the past 100 years and also looking to the future. Burnside Park Tennis Club has an enviable location, top quality courts. superb facilities and a friendly and welcoming community.

Robyn Campbell and Joe KellerA person and person cutting a cake

AI-generated content may be incorrect.

 

3.1.4         Burnside Bryndwr Community Network Hui - November 2025

Around 30 people gathered at Tuiā Burnside Primary School on Tuesday, 4 November, for the annual Burnside Bryndwr Community Network (BBCN) Hui. The evening brought together a mix of residents, community groups, sports clubs, community board members, and representatives from both local and central organisations.

The Hui provided an opportunity to share updates on recent projects and look ahead to plans. Highlights included the launch of the new BBCN website and Facebook page, updates on the Bryndwr Banter newsletter and Burnside Directory, and reflections on the first-ever Kia Ora Bryndwr - Connect with Kai. Planning is already underway to bring the event back to Bryndwr in February 2026, as well as to create a new event in Burnside called Kia Ora Burnside - Connect@Kendal.

The network continues to focus on strengthening connections, enhancing wellbeing, and celebrating the diversity of the Burnside and Bryndwr communities. A key focus for the group is BBCN’s formalisation, ensuring long-term sustainability. Work is underway to explore structure options, including establishing a Trust or an Incorporated Society. Early in 2026, a survey will be conducted with stakeholders to guide decisions, with the target of implementing a formal structure by early 2027. This process aims to strengthen the network’s foundation and support future growth.

Community Development Advisor, Karen Boag, shared early insights from the BBCN Community Engagement Project, which gathered feedback from residents and young people through surveys, focus groups, and interviews. Emerging themes include the importance of connection, communication, and participation in community life. These findings will guide the working group’s planning for the year ahead.

Guest speakers included Elissa Smith from Neighbourhood Support, who spoke about safety initiatives and community resilience, and Peter Hay from the Burnside Park Users Group, who provided an update on the group’s work exploring more sustainable and collaborative approaches for local sports clubs and community use of Burnside Park facilities.

The evening closed with an invitation for attendees to stay connected through BBCN’s communication channels and to continue working together to make Burnside and Bryndwr safe, welcoming, and vibrant places to live.

Upcoming Events 2026

·    Kia Ora Bryndwr – Connect with Kai: Monday 16 February, 5–7 pm @ Morley Reserve (Rain date: Tuesday 17 February)

·    Kia Ora Burnside – Connect@Kendal: Monday 9 March, 5–7pm @ Kendal Reserve (Rain date: Tuesday 10 March)

Find a copy of the presentation from the Hui here

Check out the BBCN’s new website: www.bbcn.org.nz

Follow BBCN Facebook: BBCN Facebook Page

 

A person standing in front of a screen

AI-generated content may be incorrect.

Jacqui Stevenson - BBCN Working Group member

 

3.1.5         Nepal Reserve Planting Day

On Monday, 29 September, over 100 residents, including families, older adults, high school students, and Scouts, gathered for the Nepal Reserve Community Planting Day. Together, they planted more than 1,500 native trees and shrubs as part of the reserve’s second planting phase, contributing to a growing native corridor that supports wildlife and strengthens the local environment.

Organised by the City Council’s Urban Forest Team with support from Community Parks, Community Park Rangers, the Fendalton-Waimairi-Harewood Community Governance Team, and Fire and Emergency NZ (FENZ), the event ran smoothly. It provided a welcoming, engaging experience for everyone. The teamwork between these groups ensured the planting day was both productive and enjoyable.

The FENZ Community Hub and fire engine visit were highlights, offering fire safety education and hands-on learning about fire-smart planting and the flammability of native species. Families especially enjoyed the opportunity to use the hose to water the new plantings, a memorable moment for children and adults alike.

A free sausage sizzle and fresh fruit were provided for volunteers and staff at 11:30 am, creating a relaxed space to take a break, refuel, and chat with neighbours. The FENZ Community Hub provided shade and a place to learn about home fire safety checks, and five lucky attendees received free smoke alarms, adding a practical safety benefit to the day.

Throughout the event, Council staff from the Community Parks and Urban Forest teams demonstrated planting techniques and offered hands-on guidance to ensure everyone could take part confidently. The friendly, inclusive atmosphere helped make the day as much about community connection as conservation.

Thanks to the community’s enthusiasm and teamwork, the planting was completed ahead of schedule, a true testament to the local spirit and collaboration that made the event such a success.

Looking ahead, Stage Three of the planting is planned for the next planting season. A group of enthusiastic residents has already expressed interest in forming a “Friends of the Reserve” group to support the Council in caring for the new planting. This partnership will help ensure the native corridor continues to thrive and that Nepal Reserve remains a vibrant, welcoming space for the whole community.

A group of people sitting on grass eating food

AI-generated content may be incorrect.

Local volunteers enjoying a break and a sausage!

 

 

3.2       Community Funding Summary

3.2.1   A status report on the Board’s 2025-26 Discretionary Response Fund and Youth Development Fund as at 20 November 2025 is attached (refer to Attachment A).

3.2.2   Youth Development Funds approved under delegation of Community Governance Manager:

·    Empire Senior Marching Team - National Marching Event in Wellington - $150

·    Jessica Willetts - NZ Secondary Schools Touch Tournament in Rotorua - $200

 

3.3       Participation in and Contribution to Decision Making

3.3.1         Report back on other Activities contributing to Community Board Plan The final monitoring report for the Board’s 2023-25 Board Plan was included in the July 2025 Area Report.  The Board will hold a workshop on 2 February 2026 to begin developing the 2026-28 Community Board Plan.

3.3.2   Council Engagement and Consultation

·     There are currently no consultations open for projects in the Waimāero Fendalton-Waimairi-Harewood area.

·     A full list of open consultations city-wide is available at https://letstalk.ccc.govt.nz/

 

4.   Advice Provided to the Community Board Ngā Kupu Tohutohu ka hoatu ki te Poari Hapori

4.1       Customer Service Request Report - Hybris monthly report for October 2025 attached, providing an overview of the number of Customer Service Requests that have been received, including the types of requests being received and a breakdown of how they are being reported (refer to Attachment B).

4.2       Fendalton-Waimairi-Harewood Graffiti Snapshot - October 2025 (refer to Attachment C).

4.3       Upcoming Orion Cable Work in Merivale (circulated 1 October 2025)

4.4       SWN - Ilam Wastewater Upgrade - Maidstone/Waimairi intersection (circulated 8 October 2025)

4.5       SWN - Farrington Avenue - generator replacement (circulated 9 October 2025)

4.6       SWN - Burnside Park - generator replacement (circulated 9 October 2025)

4.7       SWN - Wilsons Drain realignment (circulated 17 October 2025)

4.8       SWN - Bryndwr Road - street renewal (circulated 17 October 2025)

4.9       SWN - Harewood Road - new traffic signals and water upgrades (circulated 7 November 2025)

4.10    SWN - Hawthorne Street, Walnut Avenue, Lansbury Avenue - wastewater main renewals (circulated 7 November 2025)

4.11    SWN - Banff Place - water service renewals (circulated 10 November 2025)

 

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Fendalton-Waimairi-Harewood Board Funding Update - December 2025

25/2386370

121

b

Fendalton-Waimairi-Harewood Hybris Ticket Report - October 2025

25/2386578

122

c

Fendalton-Waimairi-Harewood Graffiti Snapshot - October 2025

25/2388720

123

 

 

Signatories Ngā Kaiwaitohu

Author

Maryanne Lomax - Manager Community Governance, Fendalton-Waimairi-Harewood

Approved By

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


A document with text and numbers

AI-generated content may be incorrect.


A screenshot of a computer

AI-generated content may be incorrect.


A screenshot of a computer

AI-generated content may be incorrect.

A screenshot of a map

AI-generated content may be incorrect.

 


19.   Elected Members’ Information Exchange Te Whakawhiti Whakaaro o Te Kāhui Amorangi

 

This item provides an opportunity for Board Members to update each other on recent events and/or issues of relevance and interest to the Board.

 

 

 

Karakia Whakamutunga

Unuhia, unuhia

Unuhia ki te uru tapu nui

Kia wātea, kia māmā, te ngākau,

Te tinana te wairua i te ara takatā

Koia rā e Rongo, whakairia ake ki runga

Kia tina! TINA! Hui e! TĀIKI E!

Draw on, draw on,
Draw on the supreme sacredness
To clear, to free the heart, the body and the spirit of mankind
Rongo, suspended high above us (i.e. in ‘heaven’)
Draw together! Affirm!

 

 

 


Actions Register Ngā Mahinga

When decisions are made at meetings, these are assigned to staff as actions to implement. The following lists detail any actions from this meeting that were:

 

Open Actions Ngā Mahinga Tuwhera

REPORT TITLE/AGENDA SECTION

MEETING DATE

ACTION DUE DATE

UNIT

TEAM

Groynes Boat Hire- Proposed New Licence- The Groynes

8 September 2025

8 December 2025

Facilities & Property Unit

Property Consultancy

Public Forum - Mark Smith

9 June 2025

5 January 2026

Transport & Waste

Traffic Operations

23 Holmwood Rd - Road Stopping Application

11 August 2025

30 January 2026

Facilities & Property Unit

Property Consultancy

Public Forum - Nicholas Tyler

9 June 2025

1 February 2026

Transport & Waste

Traffic Operations

Waimakariri Stopbanks

6 March 2023

27 February 2026

Three Waters

Asset Planning Water & Wastewater

Easement Over Recreation Reserve - 82 Glenturret Drive

8 September 2025

8 April 2026

Facilities & Property Unit

Property Consultancy

Bryndwr Road Street Renewal

8 September 2025

30 June 2027

Transport & Waste

Project Management

 

 

Actions Closed Since the Last Meeting Ngā Mahinga kua Tutuki nō Tērā Hui

 

REPORT TITLE/AGENDA SECTION

MEETING DATE

DUE DATE

ACTION CLOSURE DATE

UNIT

TEAM

Jamell Place - Proposed parking restrictions

10 February 2025

1 November 2025

2 October 2025

Transport & Waste

Traffic Operations

Otara Street Proposed No Stopping - Fendalton Mall entrance

10 March 2025

30 November 2025

10 August 2025

Transport & Waste

Asset Planning

Public Forum - Nicholas Tyler

9 June 2025

8 September 2025

2 July 2025

Transport & Waste

City Streets Maintenance

Standing Orders Amendment - Notices of Motion

9 June 2025

8 September 2025

2 July 2025

Community Support & Partnerships

Governance (Fen-Wai-Har)

Appointment to Riccarton Bush Trust

7 July 2025

6 October 2025

4 August 2025

Community Support & Partnerships

Governance (Fen-Wai-Har)

Proposed Road Names - 275 Highsted Road

7 July 2025

6 October 2025

15 July 2025

Planning & Consents

Resource Consents

Road Stopping at 40 Garden Road, Merivale

7 July 2025

6 October 2025

7 August 2025

Facilities & Property Unit

Property Consultancy

Spokes Canterbury

7 July 2025

6 October 2025

27 August 2025

Transport & Waste

Travel Demand Management

Spokes Canterbury

7 July 2025

6 October 2025

26 September 2025

Transport & Waste

Traffic Operations

2025/26 Fendalton-Waimairi-Harewood Discretionary Response Fund - Board Projects

11 August 2025

10 November 2025

14 August 2025

Community Support & Partnerships

Governance (Fen-Wai-Har)

Bishopdale Tennis Club Padel Court Application

11 August 2025

10 November 2025

1 October 2025

Facilities & Property Unit

Property Consultancy

Halifax Reserve play space renewal and Urban Forest plan

11 August 2025

8 September 2025

2 September 2025

Parks

Community Parks

Hyde Park play space renewal- design approval

11 August 2025

10 November 2025

28 August 2025

Parks

Community Parks

Waimāero Fendalton-Waimairi-Harewood 2025/26 Discretionary Response Fund Applications - St Mark's Presbyterian Church and St Christopher's Anglican Church

11 August 2025

10 November 2025

12 August 2025

Community Support & Partnerships

Governance (Fen-Wai-Har)

Waimāero Fendalton-Waimairi-Harewood 2025/26 Strengthening Communities Fund Applications for Consideration

11 August 2025

10 November 2025

15 August 2025

Community Support & Partnerships

Governance (Fen-Wai-Har)

Dedication of Local Purpose Reserve (Road) as Road-Kildare Street Belfast

8 September 2025

8 December 2025

26 September 2025

Facilities & Property Unit

Property Consultancy

Fendalton-Waimairi-Harewood 2025-2026 Discretionary Response Fund Application Avonhead Community Trust

8 September 2025

8 December 2025

20 October 2025

Community Support & Partnerships

Governance (Fen-Wai-Har)

Halifax Reserve play space renewal and Urban Forest plan

8 September 2025

8 December 2025

15 September 2025

Parks

Botanic and Garden Parks

Halifax Reserve play space renewal and Urban Forest plan

8 September 2025

8 December 2025

15 September 2025

Parks

Community Parks

Memorial Avenue Intersections

8 September 2025

8 December 2025

20 September 2025

Transport & Waste

Traffic Operations

Proposed Lane Names - 40B Johns Road

8 September 2025

8 December 2025

9 September 2025

Planning & Consents

Resource Consents

Urban Forest Planting Plan for Avonhead Park

8 September 2025

8 December 2025

15 September 2025

Parks

Botanic and Garden Parks

Waimāero Fendalton-Waimairi-Harewood Summer with your Neighbours 2025-26

8 September 2025

8 December 2025

9 September 2025

Community Support & Partnerships

Governance (Fen-Wai-Har)