A black text on a white background

Description automatically generated

 

 

Waitai

Coastal-Burwood-Linwood Community Board

Agenda

 

 

Notice of Meeting:

An ordinary meeting of the Waitai Coastal-Burwood-Linwood Community Board will be held on:

 

Date:                                    Monday 6 May 2024

Time:                                   4.30 pm

Venue:                                 Boardroom, Corner Beresford and Union Streets,
New Brighton

 

 

Membership

Chairperson

Deputy Chairperson

Members

Paul McMahon

Jackie Simons

Tim Baker

Kelly Barber

Celeste Donovan

Alex Hewison

Yani Johanson

Greg Mitchell

Jo Zervos

 

 

30 April 2024

 

 

 

Principal Advisor

Chris Turner-Bullock

Manager Community Governance, Coastal-Burwood-Linwood

Tel: 941 8233

 

Cindy Sheppard

Community Board Advisor

941 6547

cindy.sheppard@ccc.govt.nz

www.ccc.govt.nz

Note:  The reports contained within this agenda are for consideration and should not be construed as Council policy unless and until adopted.  If you require further information relating to any reports, please contact the person named on the report.
To watch the meeting live, or a recording after the meeting date, go to:
https://www.youtube.com/channel/UCl96HGy4yTuHdxoX3617V0g
To view copies of Agendas and Minutes, go to:
https://www.ccc.govt.nz/the-council/meetings-agendas-and-minutes/

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A poster of a company's plan

Description automatically generated with medium confidence

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

Part A           Matters Requiring a Council Decision

Part B           Reports for Information

Part C           Decisions Under Delegation

 

 

TABLE OF CONTENTS NGĀ IHIRANGI

 

Karakia Tīmatanga................................................................................................... 5 

C          1.        Apologies Ngā Whakapāha.......................................................................... 5

B         2.        Declarations of Interest Ngā Whakapuaki Aronga........................................... 5

C          3.        Confirmation of Previous Minutes Te Whakaāe o te hui o mua.......................... 5

B         4.        Public Forum Te Huinga Whānui.................................................................. 5

B         5.        Deputations by Appointment Ngā Huinga Whakaritenga................................. 5

B         6.        Presentation of Petitions Ngā Pākikitanga.................................................... 5

B         7.        Correspondence...................................................................................... 17

Staff Reports

C          8.        Waitikiri Drive - Proposed No Stopping Restrictions...................................... 21

C          9.        Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - The New Brighton and Districts Historical Society and Museum Incorporated.. 27

C          10.      Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - New Brighton Project Incorporated New Brighton Seaside Christmas Parade... 33

C          11.      Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - New Brighton Playground and Foreshore.................................................... 41

C          12.      Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - The Green Lab - Mobile Workshop.............................................................. 47

C          13.      Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - All Saints Community Facility.................................................................... 55

C          14.      Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Kāwai Rangatahi Mobile Youth Centre........................................................ 61

C          15.      Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - A Town Boxing Incorporated - Roof Repair................................................... 69

C          16.      Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Pūkeko Centre Activation......................................................................... 75

C          17.      Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Woolston Gala......................................................................................... 81

C          18.      Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Parklands United Sports Club - Activation................................................... 87

C          19.      Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Dallington Residents Association............................................................... 93

C          20.      Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - ACTIS..................................................................................................... 99

C          21.      Waitai Coastal-Burwood-Linwood Community Board Area Report - May 2024. 105  

 

B         22.      Elected Members’ Information Exchange Te Whakawhiti Whakaaro o Te Kāhui Amorangi............................................................................................................ 145  

Karakia Whakamutunga

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

Karakia Tīmatanga

Whakataka te hau ki te uru

Whakataka te hau ki te tonga

Kia mākinakina ki uta

Kia mātaratara ki tai

E hī ake ana te atakura

He tio, he huka, he hauhūnga

Tīhei Mauri Ora

Cease the winds from the west
Cease the winds from the south
Let the breeze blow over the land
Let the breeze blow over the ocean
Let the red-tipped dawn come with a sharpened air.
A touch of frost, a promise of a glorious day.

 

1.   Apologies Ngā Whakapāha  

At the close of the agenda no apologies had been received.

2.   Declarations of Interest Ngā Whakapuaki Aronga

Members are reminded of the need to be vigilant and to stand aside from decision making when a conflict arises between their role as an elected representative and any private or other external interest they might have.

3.   Confirmation of Previous Minutes Te Whakaāe o te hui o mua

That the minutes of the Waitai Coastal-Burwood-Linwood Community Board meeting held on Monday, 8 April 2024  be confirmed (refer page 7).

4.   Public Forum Te Huinga Whānui

A period of up to 30 minutes will be available for people to speak for up to five minutes on any issue that is not the subject of a separate hearings process.

 

There were no public forum requests received at the time the agenda was prepared

5.   Deputations by Appointment Ngā Huinga Whakaritenga

Deputations may be heard on a matter or matters covered by a report on this agenda and approved by the Chairperson.

 

5.1

Dallington Landing

Bebe Frayle on behalf of the Dallington Residents’ Association and David Collins on behalf of Dallington Community Trust will address the Board in relation to Dallington Landing (item 7 refers).

 

 


 

 

6.   Presentation of Petitions Ngā Pākikitanga

6.1

Alex Hewison will present a petition regarding The Thomson Park fort and playground.

 

The Thomson Park Fort has been loved across the East since the 70’s.

 

The playground is being replaced (due to its condition), and we need your help to make sure the replacement is fit for purpose! 

The current design is significantly smaller, and doesn’t feature many of the amenities we have grown to love! 

We want to ensure Thomson Park remains a destination for our locals, and people across Christchurch. 

Sign the petition below being presented to the Waitai Coastal Burwood Linwood Community Board, requesting that the Parks team consults with the board, to create a custom playground/module with a larger footprint, reflecting the needs and wishes of the community.

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

Unconfirmed

A black text on a white background

Description automatically generated

 

 

Waitai

Coastal-Burwood-Linwood Community Board

Open Minutes

 

 

Date:                                    Monday 8 April 2024

Time:                                   4.30 pm

Venue:                                 Boardroom, Corner Beresford and Union Streets,
New Brighton

 

 

Present

Chairperson

Deputy Chairperson

Members

Paul McMahon

Jackie Simons

Tim Baker

Kelly Barber

Celeste Donovan

Alex Hewison (via audio/visual link)

Yani Johanson

Greg Mitchell

Jo Zervos

 

 

 

 

 

 

 

Principal Advisor

Chris Turner-Bullock

Manager Community Governance, Coastal-Burwood-Linwood

Tel: 941 8233

 

Cindy Sheppard

Community Board Advisor

941 6547

cindy.sheppard@ccc.govt.nz

www.ccc.govt.nz

To watch the meeting live, or a recording after the meeting date, go to:
https://www.youtube.com/channel/UCl96HGy4yTuHdxoX3617V0g
To view copies of Agendas and Minutes, go to:
https://www.ccc.govt.nz/the-council/meetings-agendas-and-minutes/

 


 

Karakia Tīmatanga: Led by Paul McMahon  

 

The agenda was dealt with in the following order.

1.   Apologies Ngā Whakapāha

Part C

There were no apologies.

 

2.   Declarations of Interest Ngā Whakapuaki Aronga

Part B

There were no declarations of interest recorded.

 

3.   Confirmation of Previous Minutes Te Whakaāe o te hui o mua

Part C

Community Board Resolved CCBCC/2024/00024

That the minutes of the Waitai Coastal-Burwood-Linwood Community Board meeting held on Monday, 11 March 2024 be confirmed.

Jackie Simons/Greg Mitchell                                                                                                                                Carried

 

4.   Public Forum Te Huinga Whānui

Part B

4.1

The GreenLab Project

Bridget Allen and Jane Horn, on behalf of The GreenLab addressed the Board regarding a project to relocate and run workshops on sea level rise, flooding, fauna and flora such as restoration of saltwater marshes and native planting in Bexley Park.

The Chairperson thanked Bridget and Jane for their presentation and encouraged them to continue to work with staff.

 

Attachments

a       The GreenLab Project Presentation   

 

4.2

Greater New Brighton Community Emergency Planning

Laila Jansone on behalf of Renew Brighton addressed the Board regarding the Greater New Brighton Community Emergency Planning plan.

The Chairperson thanked Laila for her presentation and encouraged her to work with staff on this project. 

 

Attachments

a       Renew Brighton Emergency Response Presentation   

 


 

 

4.3

East Shirley Cricket

Paul Cottam, Junior Convenor and Tim Grocott, Club President, on behalf of East Shirley Cricket addressed the Board seeking support for improvements to Burwood Park and the cricket facilities in the Long Term Plan.

After questions from members, the Chairperson thanked Paul and Tim for their presentation and indicated that the Board’s Submissions Committee would consider including this in their submission to the Draft Long Term Plan.

 

Attachments

a       East Christchurch Shirley Cricket Club Presentation   

 

5.   Deputations by Appointment Ngā Huinga Whakaritenga

Part B

There were no deputations by appointment.

6.   Presentation of Petitions Ngā Pākikitanga

Part B

There was no presentation of petitions.

 

7.   Correspondence

 

Community Board Resolved CCBCC/2024/00025 Original Officer Recommendation accepted without change

Part B

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the correspondence from Spencerville Residents’ Association.

2.         Request staff organise a site visit for the Board, Council staff and representatives of the Spencerville Residents’ Association during low tide.

Jackie Simons/Jo Zervos                                                                                                                                       Carried

 

8.   Briefings

 

Staff Recommendations / Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Notes the information supplied during the Briefing.

 

Community Board Resolved CCBCC/2024/00026

Part B

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Notes the information supplied during the Briefing.

2.         Requests an update on the following Council resolutions FPCO/2024/00015:

That the Council acknowledges that the local community is continuing to experience odours coming from the damaged CWTP and request that staff:

1.    Update the Council’s website to provide a dynamic display on the landing page of the air quality readings, the pond conditions, and the primary tank status alongside any other useful information to inform the community over the state of and impact from the damaged CWTP.

2.    Re-engage with key stakeholders, including the health and welfare sectors to see what further social support can be provided.

3.    Update the Adaptive Recover plan and the status of the implementation of the findings of the independent review and provide a comprehensive report back to Council in April. 

Jackie Simons/Tim Baker                                                                                                                                      Carried

 

Attachments

a       Wastewater Treatment Plant Presentation   

 

The meeting adjourned between 5.30pm to 5.33pm.

 

9.   Proposed Road Names - 205 Mairehau Road

 

Community Board Resolved CCBCC/2024/00027 Original Officer Recommendation accepted without change

Part C

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Proposed Road Names - 205 Mairehau Road Report.

2.         Note that the decision in this report is of low significance concerning the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves the following new road names for 205 Mairehau Road (RMA/2022/1180)

a.         Road 1 - Waianiwa Place

b.         Lane 1 - Taipū Lane

Jo Zervos/Jackie Simons                                                                                                                                       Carried

 

 

10. Proposed Linwood Park Changerooms

 

Community Board Resolved CCBCC/2024/00028 Original Officer Recommendation accepted without change

Part C

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Approve proceeding to detailed design and eventual construction of the Linwood Change Rooms at Linwood Park in Attachment A to the agenda report.

2.         Approve the removal of the five trees at the proposed location of the change rooms at Linwood Park as per Attachment B and Attachment C to the agenda report.

Note: Provide support for fast tracking of Urban Forest Planting Plan for Linwood Park.

Jackie Simons/Tim Baker                                                                                                                                      Carried

Yani Johanson requested that his abstention from the resolutions be recorded.

 

 

Attachments

a       Linwood Park pavilion and toilet renewal presentation   

 

 

11. Leasing of 'red zoned' former driveways on Rocking Horse Road to adjacent neighbours

 

Community Board Resolved CCBCC/2024/00029 Original Officer Recommendation accepted without change

Part C

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Approve the leasing of the redundant driveways on the western side of Rocking Horse Road from Godwit Street to Mermaid Place as shown on the attached Southshore and South New Brighton Estuary Edge Flood Mitigation landscape plans to the agenda report.

2.         The principal terms and conditions of the leases to be generally as follows:

i.          The term is fixed at 35 years less one day.

ii.         The rent is peppercorn i.e. one dollar.

iii.        The lessees will be responsible for all works e.g. fencing, maintenance etc.

iv.        Rights to this land will not be permitted to be included in any redevelopment or intensification applications or proposals.

v.         Only adjoining owners will be permitted a lease for inclusion in their property i.e. non adjoining owners will not be leased land for off street parking.

vi.        There shall be no right of assignment or subletting other than in conjunction with the sale of the “parent” property.

vii.       Buildings will not be permitted on the leased property.

3.         Delegate authority to the Manager Property Consultancy to do all things and make any decisions necessary at his sole discretion to implement the above resolution.

Celeste Donovan/Tim Baker                                                                                                                                 Carried

 


 

 

13. Bus stop upgrades on Bluestone Drive

 

Community Board Resolved CCBCC/2024/00030 Original Officer Recommendation accepted without change

Part C

That the Waitai Coastal-Burwood-Linwood Community Board approves:

Bus stop 45420 – Opposite 78 Bluestone (Attachment A)

1.         Pursuant to Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017:

a.         That parking be restricted at all times on the east side of Bluestone Drive commencing at a point 31 metres south of its intersection with Lakebridge Place and extending in a southerly direction for a distance of 10 metres. 

b.         That a bus stop be installed on east side of Bluestone Drive commencing at a point 41 metres south of its intersection with Lakebridge Place and extending in a southerly direction for a distance of 14 metres. 

c.         That parking be restricted at all times on the east side of Bluestone Drive commencing at a point 55 metres south of its intersection with Lakebridge Place and extending in a southerly direction for a distance of 8 metres. 

2.         Pursuant to Section 339(1) of the Local Government Act 1974:

a.         That a bus passenger shelter be installed on the east side of Bluestone Drive commencing at a point 46 metres south of its intersection with Lakebridge Place and extending in a southerly direction for a distance of approximately 3.6 metres.

3.         That any previous resolutions pertaining to parking and stopping restrictions made pursuant to any bylaw to the extent that they conflict with the parking and stopping restrictions described in clauses 1 – 2 above are revoked.

4.         That these recommendations if approved, take effect when the parking and stopping restrictions that evidence the restrictions described in clauses 1 – 2 above are in place.

Greg Mitchell/Jackie Simons                                                                                                                                Carried

 

 

14. Bray Street - Proposed No Stopping Restrictions

 

Staff Recommendations / Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Approve that the stopping of vehicles be prohibited at any time on the southern side of Bray Street commencing at its intersection with Smith Street and extending in an easterly direction for a distance of 44 metres.

2.         Revoke any previous resolutions pertaining to traffic controls made pursuant to any bylaw to the extent that they are in conflict with the traffic controls described in this report.

3.         Approve that these resolutions take effect when parking signage and/or road marking that evidence the restrictions described in the staff report are in place (or removed in the case of revocations).

 

Community Board Resolved CCBCC/2024/00031

Part C

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Approve that the stopping of vehicles be prohibited at any time on the southern side of Bray Street commencing at its intersection with Smith Street and extending in an easterly direction for a distance of 44 metres.

2.         Revoke any previous resolutions pertaining to traffic controls made pursuant to any bylaw to the extent that they are in conflict with the traffic controls described in this report.

3.         Approve that these resolutions take effect when parking signage and/or road marking that evidence the restrictions described in the staff report are in place (or removed in the case of revocations).

Note: The Board notes with concern the impact of increased intensification on safety and access and ask what work is being done by the Network Planning team to address this issue.

Yani Johanson/Jackie Simons                                                                                                                             Carried

 

 

15. Aston Drive - Proposed No Stopping Restrictions

 

Community Board Resolved CCBCC/2024/00032 Original Officer Recommendation accepted without change

Part C

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Approve that the stopping of vehicles be prohibited at any time on the northern side of Aston Drive commencing 92 metres from the prolongation of the northern kerb of Sandalwood Place and following the road alignment generally in a north-westerly direction for a distance of 49 metres.

2.         Approve that the stopping of vehicles be prohibited at any time on the southern side of Aston Drive commencing 92 metres from its intersection with Sandalwood Place and following the road alignment generally in a north-westerly direction for a distance of 54 metres.

3.         Revoke any previous resolutions pertaining to traffic controls made pursuant to any bylaw to the extent that they are in conflict with the traffic controls described in this report.

4.         Approve that these resolutions take effect when parking signage and/or road marking that evidence the restrictions described in the staff report are in place (or removed in the case of revocations).

Greg Mitchell/Jo Zervos                                                                                                                                         Carried

 



16. Edmonds Street - Proposed No Stopping Restrictions

 

Community Board Resolved CCBCC/2024/00033 Original Officer Recommendation accepted without change

Part C

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Approves, pursuant to Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017, that:

a.         The stopping of vehicles be prohibited at any time on the northeast side of Edmonds Street commencing at its intersection with Randolph Street and extending in a south-easterly direction for a distance of 38 metres.

b.         The stopping of vehicles be prohibited at any time on the northeast side of Edmonds Street commencing at a point 79 metres southeast of its intersection with Randolph Street and following the road alignment generally in a southeasterly direction for a distance of 35 metres.

c.         The stopping of vehicles be prohibited at any time on the southeast side of Edmonds Street commencing at a point 38 metres southeast of its intersection with Randolph Street and extending in a southeasterly direction for a distance of 37 metres.

d.         The stopping of vehicles be prohibited at any time on the southeast side of Edmonds Street commencing at its intersection with Randolph Street and extending in a southeasterly direction for a distance of 9 metres.

2.         Revoke any previous resolutions pertaining to traffic controls made pursuant to any bylaw to the extent that they are in conflict with the traffic controls described in this report.

3.         Approve that these resolutions take effect when parking signage and/or road marking that evidence the restrictions described in the staff report are in place (or removed in the case of revocations).

Jackie Simons/Greg Mitchell                                                                                                                                Carried

 

12. Linwood and Woolston Christchurch Regeneration Acceleration Facility (CRAF) programme confirmation

 

Community Board Resolved CCBCC/2024/00034 Original Officer Recommendation accepted without change

Part C

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Approves the following Christchurch Regeneration Acceleration Facility (CRAF) projects to remain in the Linwood and Woolston CRAF programme:

a.         The construction of the Linwood Avenue School slip lane upgrade project.

b.         The construction of the Rhona Street pedestrian improvements project.

c.         The construction of the Smith Street cycle and pedestrian improvements project.

d.         The construction of the Worcester Street restoration project.

e.         The construction of the Tilford Street footpath improvements project.

f.          The investigation of the Chelsea Street restoration project, to be considered for construction.

g.         The investigation of the Butterfield Avenue restoration project, to be considered for construction.

2.         Approves the removal of the delivery of the following projects in the Christchurch Regeneration Acceleration Facility (CRAF) projects from the Linwood and Woolston CRAF programme:

h.         The Wyon Street and Hulbert Street renewal projects.

i.          The Linwood and Woolston area-wide speed restriction project.

j.          The Te Aratai College pedestrian and cycle access project.

3.         Notes that this decision supersedes the previously approved Linwood and Woolston CRAF programme on 13 April 2022 by the Waikura Linwood-Central-Heathcote Community Board, documented in the decision report 22/209652.

The division was declared carried by 9 votes to 0 votes, the voting being as follows:

For:                          Paul McMahon, Jackie Simons, Tim Baker, Kelly Barber, Yani Johanson, Celeste Donovan, Alex Hewison, Greg Mitchell and Jo Zervos

Paul McMahon/Jackie Simons                                                                                                                             Carried

 

 

Kelly Barber left the meeting at 6.40pm.

 

17. Waitai Coastal-Burwood-Linwood 2023-24 Discretionary Response Fund Application - Stitch-O-Mat

 

Community Board Resolved CCBCC/2024/00035 Original Officer Recommendation accepted without change

Part C

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Approves a grant of $2,000 from its 2023-24 Discretionary Response Fund to Stitch-O-Mat Charitable Trust towards the costs of moving and setting up at their new premises.

Jo Zervos/Tim Baker                                                                                                                                                Carried

 


 

 

18. Waitai Coastal-Burwood-Linwood Community Board Area Report - April 2024

 

Community Board Resolved CCBCC/2024/00036 Original Officer Recommendation accepted without change

Part B

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the Waitai Coastal-Burwood-Linwood Community Board Area Report for April 2024.

Paul McMahon/Tim Baker                                                                                                                                     Carried

 

 

Jo Zervos left the meeting at 6.45pm.

19. Elected Members’ Information Exchange Te Whakawhiti Whakaaro o Te Kāhui Amorangi

Part B

Members exchanged information on matters of mutual interest:

·    Tilford Street – concerns with vehicles parking on the berms.

·    Thomson Park Playground – renewal concerns.

 

 

 

 

 

 

 

Karakia Whakamutunga: Led by Paul McMahon.   

 

Meeting concluded at 6.48pm.

 

CONFIRMED THIS 6TH DAY OF MAY 2024

 

Paul McMahon

Chairperson

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

7.     Correspondence

Reference Te Tohutoro:

24/547106

Responsible Officer(s) Te Pou Matua:

Cindy Sheppard, Community Board Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose of Report Te Pūtake Pūrongo

Correspondence has been received from:

Name

Subject

Bebe Frayle and David Collins

Dallington Landing Feedback

 

2.   Staff Recommendations / Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the correspondence from Dallington Residents’ Association and Dallington Community Trust.

2.         Refer the issues raised to staff for investigation and response back to the Board.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Dallington Residents' Association and Dallington Community Trust - Landing Feedback

24/547107

18

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A letter to a person

Description automatically generated with medium confidence

A white paper with black text

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

8.     Waitikiri Drive - Proposed No Stopping Restrictions

Reference Te Tohutoro:

24/440172

Responsible Officer(s) Te Pou Matua:

Courtney Fale, Traffic Engineer

Accountable ELT Member Pouwhakarae:

Jane Parfitt, General Manager City Infrastructure

  

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       For the Waitai Coastal-Burwood-Linwood Community Board to consider the approval of extending no stopping restrictions near the pedestrian island on Waitikiri Drive.

1.2       This report has been written following a request from a resident who expressed concerns for safety of pedestrians relating to lack of visibility at the refuge island on Waitikiri Drive.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitikiri Drive - Proposed No Stopping Restrictions Report.

2.         Note that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Revoke any previous resolutions pertaining to traffic controls made pursuant to any bylaw to the extent that they are in conflict with the parking or stopping restrictions described in resolution 4 below.

4.         Approves that in accordance with Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017, that the stopping of vehicles be prohibited at any time on the eastern side of Waitikiri Drive, commencing at a point 76 metres from the prolongation of the northern kerb of Bluestone Drive and following the road alignment generally in a northeasterly direction for a distance of 75 metres, as detailed in Agenda Attachment A.

5.         Approve that these resolutions take effect when road markings that evidence the restrictions described in this staff report are in place.

 

3.   Executive Summary Te Whakarāpopoto Matua

3.1       Concerns have been raised regarding restricted visibility caused by on-street parking close to the northeastern end of the pedestrian island on Waitikiri Drive. The required crossing sight distance for this location is 44.4 metres, however, staff have found the crossing sight distance at this location would be 24.8 metres with a car parked close to the current length of no stopping restrictions.

3.2       The recommended option is to Install no stopping restrictions in accordance with Attachment A.  The length of no stopping in this option provides the required crossing sight distance, allowing pedestrians clear visibility of approaching traffic prior to attempting to cross the roadway.

3.3       Implementing the noted recommendations will lead to a reduction in the risk of crashes by improving sightlines near the pedestrian crossing.

3.4       The recommendations in this report will help to achieve the desired community outcome of a well-connected and accessible city through improved road safety.

3.5       Options within this report have been assessed against relevant industry-standard design guidance including sight distance requirements.

4.   Background/Context Te Horopaki

4.1       Visibility can be limited by parked vehicles on Waitikiri Drive.  There are high parking demands in the area at times due to the proximity of Bottle Lake Forest.

4.2       There have been 2, non-injury crashes on Waitikiri Drive in the last five years.

4.3       If approved, the recommendations will be implemented within the current financial year (generally around four weeks after the contractor receives the request, but this is subject to other factors such as resourcing and prioritisation beyond Council’s control).

Options Considered Ngā Kōwhiringa Whaiwhakaaro

4.4       The following reasonably practicable options were considered and are assessed in this report:

·   Extend the yellow lines near the pedestrian island.

·   Do nothing.

Options Descriptions Ngā Kōwhiringa

4.5       Preferred Option: Extend the existing broken yellow lines.

4.5.1   Option Description: Extend the existing restrictions for a further 19 metres.

4.5.2   Option Advantages

·     Improves pedestrian safety by increasing visibility of pedestrians and approaching vehicles.

4.5.3   Option Disadvantages

·     Removes 3 car parking spaces.

4.6       Do nothing

4.6.1   Option Description: maintain existing length of broken yellow lines.

4.6.2   Option Advantages

·     Retains 3 car parking spaces.

4.6.3   Option Disadvantages

·     Does not address safety concerns relating to visibility for pedestrians utilising the pedestrian refuge crossing point.

Analysis Criteria Ngā Paearu Wetekina

4.7       Not Applicable

 

 

 

 

5.   Financial Implications Ngā Hīraunga Rauemi

Capex/Opex Ngā Utu Whakahaere

 

Recommended Option

Option 2 – Do nothing

 

Cost to Implement

$300

$0

 

Maintenance/Ongoing Costs

$97

$0

 

Funding Source

Traffic Operations – Signs and markings budget

N/A

 

Cost to prepare report

$750 from Traffic Operations Opex budget

$750 from Traffic Operations Opex budget

 

 

6.   Considerations Ngā Whai Whakaaro

Legal Considerations Ngā Hīraunga ā-Ture

6.1       Statutory and/or delegated authority to undertake proposals in the report:

6.1.1   Part 1, Clause 7 of the Christchurch City Council Traffic and Parking Bylaw 2017 provides Council with the authority to install parking or stopping restrictions by resolution.

6.1.2   The Community Boards have delegated authority from the Council to exercise the delegations as set out in the Register of Delegations. The list of delegations for the Community Boards includes the resolution of stopping and traffic control devices.

6.1.3   The installation of any signs and/or markings associated with traffic control devices must comply with the Land Transport Rule: Traffic Control Devices 2004.

6.2       Other Legal Implications:

6.2.1   There is no other legal context, issue, or implication relevant to this decision.

6.2.2   This specific report has not been reviewed and approved by the Legal Services Unit however the report has been written using a general approach previously approved of by the Legal Services Unit, and the recommendations are consistent with the policy and legislative framework outlined in this report.

Strategy and Policy Considerations Te Whai Kaupapa here

6.3       The required decision:

6.3.1   Aligns with the Christchurch City Council’s Strategic Framework.

6.3.2   The recommendations in this report are consistent with the Christchurch Suburban Parking Policy.

6.3.3   The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy. The level of significance was determined by the low level of impact and low number of people affected by the recommended decision.

6.4       The community engagement and consultation outlined in this report reflect the assessment.

6.5       This report supports the Council's Long Term Plan (2021 - 2031):

6.6       Transport

6.6.1   Activity: Transport

·     Level of Service: 10.5.1 Limit deaths and serious injury crashes per capita for cyclists and pedestrians - <= 12 crashes per 100,000 residents.  

Community Impacts and Views Ngā Mariu ā-Hāpori

6.7       Consultation letters including a plan of the recommended option were sent to 8 affected property owners and residents. Staff received 3 responses, all in favour of the recommended option. 

6.8       The Team Leader Parking Compliance supports the preferred option.

6.9       The do nothing option is inconsistent with the request from residents to improve pedestrian sightlines and therefore safety, at the pedestrian island.

Impact on Mana Whenua Ngā Whai Take Mana Whenua

6.10    The decision does not involve a significant decision concerning ancestral land or a body of water or other elements of intrinsic value, therefore this decision does not specifically impact Mana Whenua, their culture and traditions.

6.11    The decision does not involve a matter of interest to Mana Whenua and will not impact on our agreed partnership priorities with Ngā Papatipu Rūnanga.

Climate Change Impact Considerations Ngā Whai Whakaaro mā te Āhuarangi

6.16    The proposals in this report are unlikely to contribute significantly to adaptation to the impacts of climate change or emissions reductions.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Attachment A - Waitikiri Drive Proposed Extention of No Stopping Restrictions

24/597136

25

 

 

In addition to the attached documents, the following background information is available:

Document Name – Location / File Link

Not applicable

 

 

 

Signatories Ngā Kaiwaitohu

Author

Courtney Fale - Traffic Engineer

Approved By

Katie Smith - Team Leader Traffic Operations

Stephen Wright - Manager Operations (Transport)

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A map of a neighborhood

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

9.     Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - The New Brighton and Districts Historical Society and Museum Incorporated

Reference Te Tohutoro:

24/569971

Responsible Officer(s) Te Pou Matua:

Emily Toase, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community (Andrew.Rutledge@ccc.govt.nz)

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067385

The New Brighton and Districts Historical Society and Museum Incorporated

To employ a part time curator

$26,000

$26,000

 

1.2       There is currently a balance of $470,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - The New Brighton and Districts Historical Society and Museum Incorporated Report.

2.         Note that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $26,000 from its Better-Off Fund to The New Brighton and Districts Historical Society and Museum Incorporated to employ a part time curator.

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

 

 

 

 

 

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$444,000

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - New Brighton Districts Historical Society and Museum Incorporated

24/634478

30

 

 

Signatories Ngā Kaiwaitohu

Author

Emily Toase - Community Development Advisor

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A close-up of a document

Description automatically generated

A close-up of a project

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

10.   Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - New Brighton Project Incorporated New Brighton Seaside Christmas Parade

Reference Te Tohutoro:

24/654421

Responsible Officer(s) Te Pou Matua:

Emily Toase, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067791

New Brighton Project Incorporated

New Brighton Seaside Christmas Parade

$30,000

$30,000

 

1.2       There is currently a balance of $470,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - New Brighton Project Incorporated New Brighton Seaside Christmas Parade Report.

2.         Note that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $30,000 from its Better-Off Fund to New Brighton Project Incorporated towards the New Brighton Seaside Christmas Parade for 2024, 2025 and 2026 ($10,000 per year).

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$440,000

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - New Brighton Project Incorporated New Brighton Seaside Christmas Parade

24/654434

36

 

 

Signatories Ngā Kaiwaitohu

Authors

Emily Toase - Community Development Advisor

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A close-up of a document

Description automatically generated

A close-up of a document

Description automatically generated

A screenshot of a document

Description automatically generated

A close-up of a document

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

11.   Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - New Brighton Playground and Foreshore

Reference Te Tohutoro:

24/657074

Responsible Officer(s) Te Pou Matua:

Emily Toase, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067792

CCC Parks Unit

New Brighton Playground and Foreshore

$32,000

$32,000

 

1.2       There is currently a balance of $470,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - New Brighton Playground and Foreshore Report.

2.         Note that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $32,000 from its Better-Off Fund to the Council's Parks Unit towards the towards the cost of two shade sails and two picnic benches at the New Brighton Playground and Foreshore.

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$438,000

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - New Brighton Playground and Foreshore

24/657075

44

 

 

Signatories Ngā Kaiwaitohu

Authors

Emily Toase - Community Development Advisor

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A document with text and images

Description automatically generated

A screenshot of a computer

Description automatically generated

A screenshot of a document

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

12.   Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - The Green Lab - Mobile Workshop

Reference Te Tohutoro:

24/669521

Responsible Officer(s) Te Pou Matua:

Emily Toase, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067818

The Green Lab

The Green Lab Mobile Workshop

$40,156

$35,000

 

1.2       There is currently a balance of $470,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - The Green Lab - Mobile Workshop Report.

2.         Note that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $35,000 from its Better-Off Fund to The Green Lab towards The Green Lab Mobile Workshop.

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$435,000

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - The Green Lab - Mobile Workshop

24/669712

50

 

 

Signatories Ngā Kaiwaitohu

Authors

Emily Toase - Community Development Advisor

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A close-up of a document

Description automatically generated

A document with text on it

Description automatically generated

A document with text and numbers

Description automatically generated

A document with text on it

Description automatically generated

A screenshot of a computer screen

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

13.   Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - All Saints Community Facility

Reference Te Tohutoro:

24/681691

Responsible Officer(s) Te Pou Matua:

Rory Crawford, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067823

Anglican Diocese of Christchurch - Parish of Shirley

All Saints Community Facility Outdoor Spaces

$20,000

$20,000

 

1.2       There is currently a balance of $470,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - All Saints Community Facility Report.

2.         Note that the decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $20,000 from its Better-Off Fund to Anglican Diocese of Christchurch - Parish of Shirley towards the All Saints Community Facility Outdoor Spaces.

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$450,000

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - All Saints Community Facility

24/681709

58

 

 

Signatories Ngā Kaiwaitohu

Authors

Rory Crawford - Community Development Advisor

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A close-up of a project plan

Description automatically generated

A close-up of a project

Description automatically generated

A close-up of a document

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

14.   Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Kāwai Rangatahi Mobile Youth Centre

Reference Te Tohutoro:

24/685051

Responsible Officer(s) Te Pou Matua:

Rory Crawford, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067824

Kāwai Rangatahi Trust

Kāwai Rangatahi Mobile Youth Centre

$41,394.25

$41,394.25

 

1.2       There is currently a balance of $470,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Kāwai Rangatahi Mobile Youth Centre Report.

2.         Note that the decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $41,394.25 from its Better-Off Fund to Kāwai Rangatahi Trust towards the Kāwai Rangatahi Mobile Youth Centre.

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$428,605.75

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - Kāwai Rangatahi Mobile Youth Centre

24/685052

64

 

 

Signatories Ngā Kaiwaitohu

Authors

Rory Crawford - Community Development Advisor

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A document with text and images

Description automatically generated

A document with text and numbers

Description automatically generated

A screenshot of a computer

Description automatically generated

A close-up of a document

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

15.   Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - A Town Boxing Incorporated - Roof Repair

Reference Te Tohutoro:

24/685606

Responsible Officer(s) Te Pou Matua:

Rory Crawford, Community Developent Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067826

A Town Boxing Gym Incorporated

A Town Boxing Gym Facility Roof Repairs

$84,052.40

$84,052.40

 

1.2       There is currently a balance of $470,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - A Town Boxing Incorporated - Roof Repair Report.

2.         Note that the decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $84,052.40 from its Better-Off Fund to A Town Boxing Incorporated towards the Roof Repairs.

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$385,947.60

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - A Town Boxing Gym Incorporated  - Roof Repairs

24/685620

72

 

 

Signatories Ngā Kaiwaitohu

Authors

Rory Crawford - Community Development Advisor

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A close-up of a document

Description automatically generated

A document with text and numbers

Description automatically generated with medium confidence

A document with text and a note

Description automatically generated with medium confidence


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

16.   Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Pūkeko Centre Activation

Reference Te Tohutoro:

24/658203

Responsible Officer(s) Te Pou Matua:

Tayla Smith, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067797

The Pūkeko Centre Incorporated

The Pūkeko Centre Activation

$30,000

$30,000

 

1.2       There is currently a balance of $470,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Pūkeko Centre Activation Report.

2.         Note that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $30,000 from its Better-Off Fund to The Pūkeko Centre Incorporated towards the Pūkeko Centre Activation.

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$440,000

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - Pukeko Centre Activation

24/658204

78

 

 

Signatories Ngā Kaiwaitohu

Authors

Tayla Smith - Community Development Advisor

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A close-up of a document

Description automatically generated

A document with text and numbers

Description automatically generated

A document with text and images

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

17.   Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Woolston Gala

Reference Te Tohutoro:

24/634274

Responsible Officer(s) Te Pou Matua:

Tayla Smith, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067759

Woolston Development Project

Woolston Gala Event

$21,000

$21,000

 

1.2       There is currently a balance of $470,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Woolston Gala Report.

2.         Note that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $21,000 from its Better-Off Fund to Woolston Development Project towards the Woolston Gala Event for 2024, 2025 and 2026 ($7,000 per year).

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$449,000

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.


 

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - Woolston Gala

24/634361

84

 

 

Signatories Ngā Kaiwaitohu

Authors

Tayla Smith - Community Development Advisor

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A close-up of a project plan

Description automatically generated

A document with text and numbers

Description automatically generated with medium confidence

A screenshot of a document

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

18.   Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Parklands United Sports Club - Activation

Reference Te Tohutoro:

24/686772

Responsible Officer(s) Te Pou Matua:

Tayla Smith, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067827

Parklands United Sports Club Incorporated

Parklands Community Centre Activation

$30,000

$30,000

 

1.2       There is currently a balance of $30,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Parklands United Sports Club - Activation Report.

2.         Note that the decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $30,000 from its Better-Off Fund to Parklands United Sports Club Incorporated towards the Parklands Community Centre Activation.

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$440,000

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - Parklands United Sports Club - Parklands Community Centre Activation

24/686809

90

 

 

Signatories Ngā Kaiwaitohu

Authors

Tayla Smith - Community Development Advisor

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A close-up of a document

Description automatically generated

A document with text and numbers

Description automatically generated

A screenshot of a document

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

19.   Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Dallington Residents Association

Reference Te Tohutoro:

24/654081

Responsible Officer(s) Te Pou Matua:

Jason Chee, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067787

Dallington Residents Association

Skip Days and Community Events

$15,000

$15,000

 

1.2       There is currently a balance of $470,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - Dallington Residents Association Report.

2.         Note that the decision in this report is assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $15,000 from its Better-Off Fund to Dallington Residents Association towards the provision of Skip Days and Community Events for 2024, 2025 and 2026 ($5,000 per year).

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$455,000

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - Dallington Residents Association

24/654101

96

 

 

Signatories Ngā Kaiwaitohu

Author

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A close-up of a document

Description automatically generated

A document with text and numbers

Description automatically generated with medium confidence

A screenshot of a document

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

20.   Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - ACTIS

Reference Te Tohutoro:

24/684278

Responsible Officer(s) Te Pou Matua:

Jason Chee, Community Development Advisor

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is for the Waitai Coastal-Burwood-Linwood Community Board to consider applications for funding from its Better-Off Fund as listed below.

Funding Request Number

Organisation

Project Name

Amount Requested

Amount Recommended

00067825

Aranui Community Trust A.C.T.I.S

Parking Security

$32,470.40

$32,470.40

 

1.2       There is currently a balance of $470,000 remaining in the fund.

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood - Better-Off Fund Applications for Consideration - ACTIS Report.

2.         Note that the decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.         Approves a grant of $32,470.40 from its Better-Off Fund to Aranui Community Trust A.C.T.I.S towards the Parking Security.

 

3.   Key Points Ngā Take Matua

Strategic Alignment Te Rautaki Tīaroaro

3.1       The recommendations above are aligned to the Council's Strategic Framework and in particular the strategic priorities of a Collaborative and Confident City and A Cultural Powerhouse City.  The projects also align with the Te Haumako Te Whitingia Strengthening Communities Together Strategy.

3.2       The purpose of the fund is to partner with organisations and groups to support local initiatives, projects, and activities through additional Community Board funding, including a focus on supporting local action to increase climate resilience.

3.3       Projects will improve well-being by building social capital, encouraging participation, increase accessibility and connectedness – generating opportunities for youth, and diverse communities and increasing local pride.

3.4       When considering allocation of funds, priority will be given to projects/initiatives that contribute towards the following outcomes:

·   Increasing the tree canopy across the city and our regional parks

·   Enhancing biodiversity

·   Safer neighbourhoods

·   Repairing infrastructure and facilities

·   Responding to climate change through adaptation planning

·   Encouraging active travel

3.5       Projects should also show a strong alignment to the Council's Te Haumako Te Whitingia Strengthening Communities Together Strategy. 

3.6       Priority will also be given to projects that directly contribute towards achieving Community Board Plan priorities.

            

Decision Making Authority Te Mana Whakatau

3.7       The Community Board has the delegated authority to determine the allocation of the Better-Off Fund for each community.

3.7.1   Allocations must be consistent with any policies, standards or criteria adopted by the Council.

3.7.2   The Fund does not cover:

·     Legal challenges or Environment Court challenges against the Council, Council Controlled Organisations, or Community Board decisions.

·     Projects or initiatives that change the scope of a Council project or that will lead to ongoing operational costs to the Council (though Community Boards can recommend to the Council that it consider a grant for this purpose).

Assessment of Significance and Engagement Te Aromatawai Whakahirahira

3.8       The decisions in this report are assessed as low significance based on the Christchurch City Council’s Significance and Engagement Policy.

3.9       The level of significance was determined by the number of people affected and/or with an interest.

3.10    Due to the assessment of low significance, no further community engagement and consultation is required.

Discussion Kōrerorero

3.11    At the time of writing, the balance of the Better-Off Fund is as below.

Total Budget 2023/25

Granted To Date

Available for allocation

Balance If Staff Recommendation adopted

$500,000

$30,000

$470,000

$437,529.60

 

3.12    Based on the current Better-Off Fund criteria, the applications listed above are eligible for funding.

3.13    The attached Project Brief(s) provide detailed information for the applications.  This includes organisational details, project details, financial information, and a staff assessment.

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Better Off Funding Project Brief - ACTIS

24/684550

102

 

 

Signatories Ngā Kaiwaitohu

Authors

Jason Chee - Community Development Advisor

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A close-up of a document

Description automatically generated

A document with text and numbers

Description automatically generated

A screenshot of a document

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

21.   Waitai Coastal-Burwood-Linwood Community Board Area Report - May 2024

Reference Te Tohutoro:

24/439383

Responsible Officer(s) Te Pou Matua:

Christopher Turner-Bullock, Community Governance Manager
christopher.turner@ccc.govt.nz

Accountable ELT Member Pouwhakarae:

Andrew Rutledge, Acting General Manager Citizens and Community

 

 

1.   Purpose and Origin of the Report Te Pūtake Pūrongo

1.1       The purpose of this report is to provide the Board with an overview on initiatives and issues current within the Community Board area.

1.2       The report is staff generated.

 

2.   Officer Recommendations Ngā Tūtohu

That the Waitai Coastal-Burwood-Linwood Community Board:

1.         Receive the information in the Waitai Coastal-Burwood-Linwood Community Board Area Report - May 2024 Report.

 

3.   Community Support, Governance and Partnership Activity

3.1       Community Governance Projects

Activity

Detail

Timeline

Strategic Alignment

Mugford Restoration Project

60 staff from Kiwicare volunteered over 3 days to help the Avon Heathcote Estuary Ihutai Trust with their latest restoration project at Mugford, Bexley. The group weeded, guarded and mulched around newly planted native vegetation and learnt about predator control and setting out a trapping line.

On-going

Enhancing Environmental wellbeing

House of Hoopz Street Ball league

The Grand Final of the House of Hoopz was held on 30 March 2024 at the New Brighton half court along Marine Parade. The winners of each of the events in the series, headed to New Brighton's half court to battle it out for the kudos of being House of Hoopz champions.

The event attracted over hundred spectators from right across the city who came to cheer on their team, friends and whānau and passersby who simply stopped to watch the action.

 

Each of the competitions in the league series, culminating in the finals at New Brighton have activated public recreational spaces with positive activity for rangatahi.

30 March

New Brighton Safety Initiatives: 

Support engagement with youth sector in the development of activities and recreational spaces for our tamariki in the mall, and key activity areas across the ward

Stitch-O-Mat

Stitch-O-Mat have now moved to their new location at Shop 4 Carnaby Lane in New Brighton Mall as of 8 April. After The Brighton Gallery Trust moved out of the premises there was potential for it to join the list of unoccupied buildings in New Brighton Mall, adding to the associated problems with unoccupied shops. With the cooperation of the property owner and funding support from the Waitai Community Board, Stitch-O-Mat have managed to secure the lease and move fairly quickly, ensuring continuity of their services for the community and also that the space was not left unoccupied for very long.

On-going

New Brighton Mall

Woolston Gala

Staff met with Woolston Development Project to start to plan for the re-establishment of the Woolston Gala to be held on Woolston Park.

Currently staff are surveying local groups, residents and businesses to gauge interest in being part of a Gala.

Staff are aiming to plan for a Gala to be held in November of this year. 

On-going

Woolston Village Safety Initiatives

 


 

 

3.2       Community Funding Summary

3.2.1   For the Board’s information, a summary is provided (refer Attachment A) on the status of the Board’s 2023-24 funding as at 16 April 2024.

 

3.3       Participation in and Contribution to Decision Making

3.3.1   Report back on other Activities contributing to Community Board Plan [for items not included in the above table but are included in Community Board Plan]

·     Community Garden Pride Awards

On Monday 15 April 2024, the Board hosted their annual Community Garden Pride Awards at the Aranui Wainoni Community Centre. A total of 158 recipients in the Waitai Coastal-Burwood-Linwood Community Board will receive a certificate with approximately 34 handed out at the event.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 


·     Port Link Briefing

The Waitai Community Board received an update from the Head of Planning and Consents, the Team Leader for RMA Compliance, the Senior Planner and Solicitor who have been working on the Port Link site. The Board requested that the hui would be held at a venue that was nearby the community affected, so that residents who live near the Port Link facility could attend the briefing in person to hear the update, rather than travelling to the New Brighton Boardroom or listening to the livestream.

Supporting this request, the hui was arranged to be held at the former Waikura Linwood-Central-Heathcote Community Boardroom at Smith Street in Woolston on 21 March 2024. Four residents attended and were invited to the table by the Board Chair to be able to ask questions and engage with the kōrero alongside their elected representatives. The residents fed back that they appreciated and valued the opportunity to ask questions directly and that the briefing was open for them to attend.

A group of people sitting around a table

Description automatically generated

 

 

 

 

 

 

 

 

 

 

 

 

·     South Island Novice Championships

Woolston Boxing club hosted and ran the South Island Novice Championships 2024 on 23 and 24 March at their home at Woolston Club. With 60 fights on the Saturday and then another 20 on the Sunday Finals Day. The gym was packed with hundreds of young athletes testing their training and skills against other boxers from all over the South Island. 

Staff and volunteers from Woolston Boxing Club put in a huge amount of mahi in the lead up to and in the weekend of the Championships to make sure it was a fun, safe and exciting for all involved. The ring and arena were built with the help of members parents who donated not only materials but time to the Club. The event planning, administration and operations was divvied out to a pool of volunteers who are either members themselves or have tamariki training at the Club. The successes of the winners mirrored the hard work and positive attitudes demonstrated by the staff, coaches and officials working with the young people in their Clubs. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

·     House of Hoopz Grand Final

House of Hoopz Ōtautahi hit New Brighton's half court on Saturday 30 March 2024. The contest saw finalists from eight different suburbs battling it out for the kings or queens of the court and have House of Hoopz 2024 bragging rights.

House of Hoopz is the latest streetball competition in Ōtautahi delivered by Youth and Cultural Development (YCD), supported by Christchurch City Council, Selwyn District Council, The Gators, Clubkingz, Whanaketanga Barbers and Lulus Braids over the past eight weeks.

The streetball league saw great talent across each competition, which began in Shirley before heading into Hoon Hay, Belfast, Linwood, Selwyn, Aranui, Hornby and Phillipstown. Winners from these suburban tournaments then made their way down to New Brighton's half court on the Saturday to play off in the finals.

Alongside the 3x3 games, the event welcomed participants for a 'dunk' contest as well as a three-point contest with lots of prizes up for grabs.

The Fresh Team from YCD provided a free BBQ for players and spectators but free braids from Lulu’s House of Braids as the Barbarians who offered free fades for all young people.

A guest appearance from local artist Big Sima was made alongside DJ INFRARED, a Flava Radio Station DJ and CLUB KINGZ DJ. With the streetball league targeted at youth, offered all young people the chance to play street sports. YCD aimed to take away financial barriers that may arise with playing sports.

Wrapping up for 2024, it was the Linwood team who won the title of champions, promising to be the team to beat in 2025.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

·     Climate Action Campus

Lots has been happening at the Climate Action campus as their projects continue to progress. In the last month volunteers have been working on a new food forest on the former cricket fields and a new container was delivered which is the first piece of kit for the native nursery project the NZ Conservation Volunteers are establishing on site.

The main office and some of the old classrooms at the campus are getting a new lease of life with volunteer artists designing and creating murals on the bare outside walls.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

·     Community Soup Event

The Driftwood Council of Brighton ran the first of their New Brighton Soup on Monday 25 March 2024. For a $10 entry fee participants received a bowl of soup to enjoy and one vote for the best pitch of the night. They heard from several individuals and groups who were presenting their idea for a great project for Greater Brighton. All the proceeds go towards making the winning idea happen.

This event was a collaboration with New Brighton Community Gardens who provided the ingredients for and made the soup, New Brighton Surf Life Saving Club who provided the venue and the members of the Driftwood Council who put the event together.

Amongst the several pitches who presented the ideas, it was Brighton Gallery Trust who won the community vote and received over $200 for their youth roller-door project.

May be an image of 9 people, people studying and table

 

 

 

 

 

 

 

·     Community Law Workshop

In partnership with Community Law, Waitai Community Governance staff organised a workshop held on the 5 April for community groups who have Incorporated Society status to learn about the changes to the law.

The workshop went in-depth into the steps groups are going to need take to re-register their organisations and the additional administration that is required as part of the changes to the Incorporated Societies Act. Staff have heard that groups have been apprehensive of their new obligations under the Act and so being able to provide a workshop delivered by a professional from Community Law was important. The groups were able to deep dive into what exactly they needed to do and ask questions specific to their legal status and context.

A group of people sitting around tables

Description automatically generatedStaff will continue to work with Community Law to develop a schedule of future workshops to continue to support community organisations through the coming changes.

 

 

 

 

 

 

 

3.3.2   Council Engagement and Consultation.

·     The Waitai Coastal-Burwood-Linwood Community Board Submissions Committee held a meeting on Thursday 4 April 2024. Presented for record purposes (refer Attachment B) are the Board’s Submissions Committee Minutes and Submission to the Council on the Ōtākaro Avon Stormwater Management Plan.

·     The Waitai Coastal-Burwood-Linwood Community Board held a Long Term Plan Workshop with local groups on Thursday 4 April 2024. The feedback received during this workshop will be taken into consideration for inclusion in the Board’s Draft Long Term Plan 2024-34 Submission.

 

 

 

 

 

 

 

 

 

 

 

 

 


·     The Waitai Coastal-Burwood-Linwood Community Board Submissions Committee held a meeting on Tuesday 16 April 2024. Presented for record purposes (refer Attachment C) are the Board’s Submissions Committee Minutes and Submission to the Council on the Draft Long Term Plan 2024-2034.

 

3.4       Governance Advice

3.4.1   Urban Waterways and Estuaries Joint Working Group

At its meeting on 12 February 2024, the Board received an item of correspondence from Councillor J Davies, Environment Canterbury in relation to feedback sought to re-establish the Urban Waterways and Estuaries Joint Working Group. The Board requested that staff consider presenting this at the next Governors Forum for discussion between Christchurch City Council and Environment Canterbury.

Staff have advised that Councillor J Davies circulated a memorandum summarising the feedback he received ahead of the 15 March 2024 ECan:CCC Governors Meeting. It is understood that this topic was not raised at the meeting. ECan staff will seek to follow up with Councillor Davies.


 

3.4.2   Berms surrounding Linfield Park

At its meeting on 11 September 2023, during consideration of the monthly Area Report, the Board resolved to request staff provide advice on costs involved with regards to planting at the berms surrounding Linfield Park. Staff have provided the following response:

Area of berm assessed is between the legal boundaries of the sports facility.

Total area of grass berm approx. 497m2 /around 257 linear meters both estimated by desk top exercise.

Associated risks:

Services -unfortunately, there is an Enable cable running the length of the berm around 1 meter from the kerb which in itself would deem the project impractical.

There are several stormwater outlets within the berms which would also prohibit work around these assets.

There are 6 trees (magnolia grandiflora) in the berms which will need a TPMP plan for working around, will not be able to excavate sufficient depth for shrub planting around the trees i.e. within the drip lines.

When digging out would potentially need to shore up along the kerb and footpath sides of the grass berms to prevent undermining of these assets which again may place limitations regarding excavation.

Car’s parking along the gardens (if formed/approved) Passengers would be exiting the vehicle directly into the gardens (not ideal) and my hunch is that including pedestrian foot traffic crossing between fields would damage the shrubs /gardens.

Estimated costs

$99,736.00

Includes Technical design/scoping/project management, service location, Traffic management, Tree protection plan, dig out/back fill, shrub planting, mulch and establishment maintenance for up to two years.

The scale of work would make this a capital programme job, Road Amenity and Asset Protection only have budgets to maintain. If the Board would like something to happen here, they would need to advocate for capital funding through LTP/AP processes.

 

3.4.3   Safety Improvements to Rudds Road

At its meeting on 11 March 2024, during consideration of the monthly Area Report, the Board resolved to request that staff consider including improvements to Rudds Road between Kearneys Road and Cypress Street. Staff have provided the following response:

Unfortunately there is insufficient budget to accommodate additional scope beyond providing the speed humps to address the issues identified on Cypress Street.  The project is being funded from the Minor Safety Interventions programme, which aims to do around five projects per year from a budget of $300k.  With a budget of this scale there is limited flexibility to allow for increased scope.

 

Board Members may be aware of the Bromley Action Plan which is being developed separately. Rudds Road is within the area under consideration, so the Board could advocate for this to be put forward for inclusion within the action plan.


 

4.   Advice Provided to the Community Board Ngā Kupu Tohutohu ka hoatu ki te Poari Hapori

4.1       Avon Park Redevelopment Project

Attached for the Board’s information, staff memorandum providing an update on the Avon Park Redevelopment Project (refer Attachment D).

4.2       Customer Service Request/Hybris Report

For the Board’s information, attached is a copy of the March 2024 Hybris Report (refer Attachment E). It is noted that the Hybris Team have changed the graffiti tickets so they will be separated from where they were. The change was effective from 20 March and explains why there are multiple types of graffiti tickets showing in the table. 

4.3       Mural, Broad Park

At its meeting on 12 February 2024, the Board received a public forum presentation from David Caines in relation to a proposed mural on the toilet block at Broad Park. The Board requested staff report on next steps for the proposed mural project. Attached for the Board’s information, staff memorandum providing an update on the next steps of the mural project (refer Attachment F).

 

 

 

Attachments Ngā Tāpirihanga

No.

Title

Reference

Page

a

Waitai Coastal-Burwood-Linwood Community Board - Funding Update as at 16 April 2024

24/636318

117

b

Waitai Coastal-Burwood-Linwood Community Board Submissions Committee 4 April 2024 - Minutes and Board Submission

24/597157

120

c

Waitai Coastal-Burwood-Linwood Community Board Submissions Committee 16 April 2024 - Minutes and Board Submission

24/653683

126

d

Waitai Coastal-Burwood-Linwood Community Board - Avon Park Redevelopment Project - Staff Memorandum

24/579729

138

e

Waitai Coastal-Burwood-Linwood Community Board - Hybris Report - March 2024

24/597039

142

f

Waitai Coastal-Burwood-Linwood Community Board - Broad Park Mural - Staff Memorandum

24/650616

143

 

 

Signatories Ngā Kaiwaitohu

Authors

Cindy Sheppard - Community Board Advisor

Rory Crawford - Community Development Advisor

Emily Toase - Community Development Advisor

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Approved By

Christopher Turner-Bullock - Manager Community Governance, Coastal-Burwood-Linwood

Matthew McLintock - Manager Community Governance Team

John Filsell - Head of Community Support and Partnerships

 

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A screenshot of a document

Description automatically generated

A screenshot of a document

Description automatically generated

A screenshot of a computer

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A white paper with black text

Description automatically generated

A close-up of a document

Description automatically generated

A document with a star

Description automatically generated

A document with black text and black text

Description automatically generated

A white background with black dots

Description automatically generated

A document with text on it

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A white paper with black text

Description automatically generated

A close-up of a document

Description automatically generated

A document with text and a star

Description automatically generated

A document with black text and white text

Description automatically generated

A white background with black dots

Description automatically generated

A document with text and images

Description automatically generated with medium confidence

A document with text on it

Description automatically generated

A document with text on it

Description automatically generated

A document with text on it

Description automatically generated

A document with black text

Description automatically generated

A document with text on it

Description automatically generated

A document with a star and text

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A document with text on it

Description automatically generated

A screenshot of a document

Description automatically generated


A map of a land

Description automatically generated

A map of a landscape plan

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A screenshot of a computer

Description automatically generated


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

A close-up of a document

Description automatically generated

A screenshot of a computer

Description automatically generated

 


Waitai Coastal-Burwood-Linwood Community Board

06 May 2024

 

 

22.   Elected Members’ Information Exchange Te Whakawhiti Whakaaro o Te Kāhui Amorangi

 

This item provides an opportunity for Board Members to update each other on recent events and/or issues of relevance and interest to the Board.

 

 

 

Karakia Whakamutunga

Kia tau te rangimārie

O te Rangi e tū iho nei

O Papatūānuku e takoto nei

O te Taiao e awhi nei

Ki runga i a Tātou

Tihei Mauriora

May the peace

of the sky above

Of the earth below

And the all-embracing universe

Rest upon us all

Behold, it is life!